Multi-parameter integrated experimental analysis of wall compaction effect on Semi-automatic plastering machine
1 Department of Mechanical Engineering, Shandong Labor Vocational and Technical College, Jinan, China
2 School of Mechanical Engineering, Shandong University of Technology, Zibo, China
a Corresponding author: dmh-1976@163.com
Semi-automatic wall plastering machine can effectively reduce the labor intensity of workers, increase operational efficiency in the construction process. A problem is solved how to select its work parameters. In order to obtain the best working conditions of a certain wall plastering machine, this paper has studied hydrostatic compaction process of the wall plastering machine. According to “Standard of the Architectural Decoration Project Quality Approval” in China, mortar compaction effects in cases of different plastering speed, rotation speed of the screw auger, and mortar consistency have been obtained by experiments. Using static-pressure method for wall plastering, experimental results showed that the best plastering speed, screw auger rotation speed and mortar consistency is in the range of 17~18.2cm/s, 55~65r/min and 78~86mm.
© Owned by the authors, published by EDP Sciences, 2015
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.