Experimental Study on Post Grouting Bearing Capacity of Large Diameter Bored Piles
College of Highway, Chang’an University, Xi’an, Shaanxi, China
* Corresponding author: wangduanduan11@163.com
Post grouting can improve the inherent defects such as the formation of the mud cake at pile side and the sediment at pile end in the process of bored pile construction. Thus post grouting has been widely used in Engineering. The purpose of this paper is to research the influences of post grouting to pile bearing capacity more systematically and intuitively. Combined with the static load test of four test piles in Weihe River Bridge test area of new airport highway in Xi’an, the bearing capacity and settlement of routine piles and post grouting piles are comparatively analyzed. The test results show that under the same geological condition, post grouting can improve the properties of pile tip and pile shaft soil of bored piles significantly, enhance the ultimate resistance, improve the ultimate bearing capacity and reduce the pile tip settlement. Then post grouting can aim to optimize pile foundation.
Key words: bored pile / post grouting / settlement / bearing capacity / pile shaft resistance / pile tip resistance
© Owned by the authors, published by EDP Sciences, 2015
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.