Experimental investigation of deep drawing of C-rail benchmark using various lubricants
Department of Mechanical Engineering, Centre for Mechanical Technology and Automation, University of Aveiro, 3810-193 Aveiro, Portugal
a Corresponding author: e-mail: xin@ua.pt
This paper deals with the deep drawing of C-rail experimental benchmark, which has a complex deformation path. The influence of various lubricants, including the dry friction, low and high viscosity mineral oil, semisolid grease and PTFE film on the drawability of dual-phase steel sheets, was performed. The digital image correlation technique was applied for component tests as well as the deformation analysis. The drawability was experimentally assessed by comparing surface roughness, thickness reduction, and springback of drawn component. The experimental results indicate that the interfacial lubrication between tools and work-piece plays an important role on the drawability of advanced high strength steel sheets. The quality of component was improved obviously by using PTFE film compared to the other lubricants.
© Owned by the authors, published by EDP Sciences, 2015
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.