Improving Formwork Using Lean Tools
1 College of Architecture, Arts and Humanity, Clemson University, USA
2 Department of Civil Engineering, National Pingtung University of Science and Technology, Taiwan
* Corresponding author: eppm.journal@gmail.com
Materials for modules and payments for your workers are some of the main expenses for the concrete structures with stiffness. In view of this, module construction is one of the essential factors if the project succeeds or not. Traditional module construction that is involved in those activities without adding values results in wastes. This study aimed at adopting a compact method to reduce waste in the module works. The compact module construction model is developed to achieve this goal. Andon of this model is made use of build a spot assurance system. Labours can be assisted immediately in case of any issues are raised. Besides Andon, module processes are introduced to the Kanban system to decrease mold stock and fulfil the flow of process behind ceaseless work. There was one real case discussed to verify if the proposed module applies to all. Application findings indicate that the developed method is able to conduct mandatory banishment in the module flow of the process and add value in the operation.
Key words: Kanban system / compact / module / Andon
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.