Issue |
MATEC Web Conf.
Volume 276, 2019
International Conference on Advances in Civil and Environmental Engineering (ICAnCEE 2018)
|
|
---|---|---|
Article Number | 02015 | |
Number of page(s) | 10 | |
Section | Construction Management | |
DOI | https://doi.org/10.1051/matecconf/201927602015 | |
Published online | 15 March 2019 |
Development of knowledge management in integration management systems in order to increase the organisational performance of construction companies
1 Department of Civil Engineering, Universitas Indonesia, Depok, Indonesia
2 Department of Industrial Engineering, Universitas Indonesia, Depok, Indonesia
* Corresponding author: riggym31@gmail.com
The previous research on integrated management systems has varied. Most of them used a structural equation model (SEM) or consisted of a literature review. These studies have not yet presented a relationship between integration management systems at the practical level in order to improve organisational performance. These studies have not included knowledge management in their implementation. Research on knowledge management is needed in order to minimise the inefficiency of an organisation. The level of maturity of knowledge management in construction companies is only about 50% (at the practiced level). The biggest obstacle to the realisation of an integrated management system is a lack of knowledge management. Knowledge management is a key standard in integrated management and sustainability reporting. This study aims to identify the most important variables needed in the context of the development of knowledge management and integrated management systems through RII analysis, including developing a job description through RAM RACI R (Responsible), A (Accountable), C (Consult), and I (Inform).
© Owned by the authors, published by EDP Sciences, 2012
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.