Issue |
MATEC Web Conf.
Volume 63, 2016
2016 International Conference on Mechatronics, Manufacturing and Materials Engineering (MMME 2016)
|
|
---|---|---|
Article Number | 05011 | |
Number of page(s) | 4 | |
Section | Computer Engineering and Applications | |
DOI | https://doi.org/10.1051/matecconf/20166305011 | |
Published online | 12 July 2016 |
Research on Early dismantling head of numerical simulation and experiment
1 Guizhou construction science Research & Design Institute limited company of CSCEC, Guizhou Guiyang, 550006, China
2 The third construction engineering co. LTD of China construction Forth engineering division CORP. LTD
a Corresponding author: 308369555@qq.com
The template support-system projects not only need to complete the range of quality optimization in one construction work, but also to make one of the sound security work. Installation and removal of template support-system are the largest amount of labor. To seek the template works rationalization and reduce the cost of the template works, it is an important way to save a lot of labor and reduce the cost of concrete structure. Therefore, how to improve the template engineering design and its production, installation, operation and removal efficacy effectively and make further reform of the template project for improving the quality of the project are of great significance in the construction of civilization.
© Owned by the authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.