Articles citing this article

The Citing articles tool gives a list of articles citing the current article.
The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program. You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).

Cited article:

Cost Overrun Factor of Toll Road Project Construction

Muhammad Nafhan Isfahani, Eri Setia Romadhon and Muhammad Imany Romadhon
IOP Conference Series: Earth and Environmental Science 1321 (1) 012025 (2024)
https://doi.org/10.1088/1755-1315/1321/1/012025

Construction projects: interactions of the causes of delays

Mahesh Babu Purushothaman, Leo Neil Resurreccion San Pedro and Ali GhaffarianHoseini
Smart and Sustainable Built Environment (2024)
https://doi.org/10.1108/SASBE-11-2023-0334

The impact of clients’ procurement challenges on the substance goals of roads construction projects in Songwe, Tanzania

Baraka Israel
International Journal of Construction Management 23 (12) 2144 (2023)
https://doi.org/10.1080/15623599.2022.2045861

Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand

Mahesh Babu Purushothaman and Sumit Kumar
Smart and Sustainable Built Environment 11 (2) 294 (2022)
https://doi.org/10.1108/SASBE-08-2021-0145

Forecasting Liquidated Damages via Machine Learning-Based Modified Regression Models for Highway Construction Projects

Odey Alshboul, Mohammad A. Alzubaidi, Rabia Emhamed Al Mamlook, Ghassan Almasabha, Ali Saeed Almuflih and Ali Shehadeh
Sustainability 14 (10) 5835 (2022)
https://doi.org/10.3390/su14105835

Building Information Modelling (BIM) Implementation for Highway Project from Consultant’s Perspectives in Malaysia

E Halim, A Mohamed and M S Fathi
IOP Conference Series: Earth and Environmental Science 971 (1) 012003 (2022)
https://doi.org/10.1088/1755-1315/971/1/012003

Possession of Site: Another Layer of Complexity in Road Construction

Norhana Danial and Mohd Saidin Misnan
Sustainability 14 (11) 6809 (2022)
https://doi.org/10.3390/su14116809

Significant Factors Causing Delay in the Cambodian Construction Industry

Faham Tahmasebinia and Vicheth Song
Sustainability 14 (6) 3521 (2022)
https://doi.org/10.3390/su14063521

Factors affecting construction costs in Thailand: A structural equation modelling approach

Thanwandee Chinda
International Journal of Construction Supply Chain Management 10 (3) 115 (2020)
https://doi.org/10.14424/ijcscm100320-115-140

Causes of delays in construction project for developing Southeast Asia countries

H D Wuala and A D Rarasati
IOP Conference Series: Materials Science and Engineering 830 (2) 022054 (2020)
https://doi.org/10.1088/1757-899X/830/2/022054