Open Access
Issue
MATEC Web Conf.
Volume 192, 2018
The 4th International Conference on Engineering, Applied Sciences and Technology (ICEAST 2018) “Exploring Innovative Solutions for Smart Society”
Article Number 02014
Number of page(s) 4
Section Track 2: Mechanical, Mechatronics and Civil Engineering
DOI https://doi.org/10.1051/matecconf/201819202014
Published online 14 August 2018
  1. José Ramón San Cristbal, Time, Cost, and Quality in a Road Building Project, Journal of Construction Engineering and Management, Vol.135, 1271-1274 (2009) [CrossRef] [Google Scholar]
  2. Ibrahim Mahamid, Amund Bruland and Nabil Dmaidi, Cause of Delay in Road Construction Projects, Journal of Management in Engineering, Vol.28, 300 – 310 (2012) [CrossRef] [Google Scholar]
  3. Soo-Yong Kim, Kiet Nguyen Tuan and Van Truong Luu, Delay Factor Analysis for Hospital Projects in Vietnam, KSCE Journal of Civil Engineering 20, 519 – 529 (2016) [CrossRef] [Google Scholar]
  4. Jesper Kranker Larsen, Geoffrey Qiping Shen, Soren Munch Lindhard and Thomas Ditlev Bronoe, Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects, Journal of Management in Engineering,32 (2016) [Google Scholar]
  5. Sadi A. Assaf, Sadiq Al-Hejji, Causes of delay in large construction projects, International Journal of Project Management, 24, 349-357 (2006) [Google Scholar]
  6. Wa’el Alaghbari, Mohd. Razali A. Kadir, Azizah Salim and Ernawati, The significant factors causing delay of building construction projects in Malaysia, Vol.14,192 – 206 (2007) [Google Scholar]
  7. Long Le Hoai, Young Dai Lee and Jun Yong Lee, Delay and Cost Overruns in Vietnam Large Construction Projects :A Comparison with Other Selected Countries, KSCE Journal of Civil Engineering, 12,367–377 (2008) [CrossRef] [Google Scholar]
  8. Romuald-Kokou T.M. Akogbe, Xin Feng, and Jing Zhou, Importance and Ranking Evaluation of Delay Factors for Development Construction Projects in benin, KSCE Journal of Civil Engineering 17, 1213 – 1222 (2013) [CrossRef] [Google Scholar]
  9. Report on Department of Highways, Highways Construction Performance Evaluation in Fiscal Year 2014 and 2015, Department of Highways, Ministry of Transports, Bangkok, Thailand [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.