The Citing articles tool gives a list of articles citing the current article. The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program. You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).
Enhancing Construction Claims Resolution Efficiency: A Systematic Review of the UAVs Applications in Construction Claim Management
Mohammad Al Omari, Hossein Ataei, Abolfazl Seyrfar, Aaraf Alqaisi and Ibrahim Osman Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 17(3) (2025) https://doi.org/10.1061/JLADAH.LADR-1172
Development of Work Breakdown Structure (WBS) for Rapid Damage Runway Repair (RADARR) Time Planning at Military Airbases
Pungky Dharma Saputra, Muhammad Hamzah Fansuri, Anasya Arsita Laksmi, R. Fatoni, F. Camelia, A. Kristanto, Ardiyanto, W. Setiawan, A. Mulyaningtyas, E. Setiawan, A.D. Anggono, M. Kusban, F. Tri Nugrahaini, A.S. Putri, D.A. Prasetya, N. Aklis, N. Hidayati and G.A. Prasetyaningtiyas E3S Web of Conferences 517 05002 (2024) https://doi.org/10.1051/e3sconf/202451705002
Pria Akbar Sejati, Wisnu Isvara and Yusuf Latief 2730 020118 (2023) https://doi.org/10.1063/5.0121463
Proceedings of the 5th International Conference on Rehabilitation and Maintenance in Civil Engineering
D. V. Aryanto, L. S. Riantini, R. A. Machfudiyanto and Y. Latief Lecture Notes in Civil Engineering, Proceedings of the 5th International Conference on Rehabilitation and Maintenance in Civil Engineering 225 641 (2023) https://doi.org/10.1007/978-981-16-9348-9_56
Identification of Building Architectural Work Construction Safety Risks
Dinda Syafryn Aurellina, Rossy Armyn Machfudiyanto, D.A. Joshi, N.B. Ibrahim and D.M. Sangeetha E3S Web of Conferences 405 03014 (2023) https://doi.org/10.1051/e3sconf/202340503014
Risk identification approaches and the number of risks identified: the use of work breakdown structure and business process
A method to develop performance indicators based on performance criteria of Indonesian National Occupational Competency Standards (SKKNI) for construction safety technician competency
Implementation of standardized wbs (work breakdown structure) for time and cost performance. (study case: building project PT. X, Kuala Tanjung, Sumatera Utara)