Open Access
| Issue |
MATEC Web Conf.
Volume 411, 2025
Joint 14th International Conference on Engineering, Project, and Production Management (EPPM2024) and 5th Zaytoonah Engineering Conference (ZEC2024)
|
|
|---|---|---|
| Article Number | 02003 | |
| Number of page(s) | 21 | |
| Section | Construction Engineering, Materials, and Sustainability | |
| DOI | https://doi.org/10.1051/matecconf/202541102003 | |
| Published online | 05 September 2025 | |
- Abd El-Razek, M. E., Bassioni, H. A., & Mobarak, A. M. (2008). Causes of Delay in Building Construction Projects in Egypt. Journal of Construction Engineering and Management, 134(11), 831-841. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:11(831) [Google Scholar]
- Abd-Karim, S. B. (2016). The application of value management on private projects. QSLink. Board of Quantity Surveyors Malaysia Bulletin, 2, 33-36. [Google Scholar]
- Anerao, S. D., & Deshmukh, S. S. (2016). Waste minimization by lean construction technology. International Research Journal Of Engineering And Technology, 3(8), 1703-1707. [Google Scholar]
- Arbulu, R. & Zabelle, T. 2006. Implementing Lean in Construction: How to Succeed, 14th Annual Conference of the International Group for Lean Construction, 553-565 [Google Scholar]
- Bajjou, M. S., Chafi, A., & En-Nadi, A. (2017). A Comparative Study between Lean Construction and the Traditional Production System. International Journal of Engineering Research in Africa, 29, 118-132 https://doi.org/10.4028/www.scientific.net/JERA.29.118 [Google Scholar]
- Barima, O. K. B. (2010). Examination of the best, analogous, competing terms to describe value in construction projects. International Journal of Project Management, 28, 195-200. https://doi.org/10.1016/j.ijproman.2009.05.009 [Google Scholar]
- Barrie, D. S., & Paulson, B. C. (1992). Professional Construction Management. McGraw-Hill Education. [Google Scholar]
- Bowen, P., Cattell, K., Edwards, P., & Jay, I. (2010). Value management practice by South African quantity surveyors. Facilities, 28(1/2), 46-63. https://doi.org/10.1108/02632771011011396 [Google Scholar]
- Chen, W. T., Chang, P.-Y., & Huang, Y.-H. (2010). Assessing the overall performance of value engineering workshops for construction projects. International Journal of Project Management, 28(5), 514-527. https://doi.org/10.1016/j.ijproman.2009.08.005 [Google Scholar]
- Coetzee, C. E. (2009). Value management in the construction industry: What does it entail and is it a worthwhile practice? University of Pretoria. [Google Scholar]
- Daoud, A. O., Othman, A. A. E., Ebohon, O. J. Overcoming the limitations of the green pyramid rating system in the Egyptian construction industry: A critical analysis. Architectural Engineering and Design Management, 18(2), 114-127. https://doi.org/10.1080/17452007.2020.1802218 [Google Scholar]
- Dell'Isola, A. (1997). Value Engineering: Practical Applications…for Design, Construction, Maintenance and Operations. John Wiley & Sons. [Google Scholar]
- Diekmann, J., Krewedl, M., Balonick, J., Stewart, T., & Wonis, S. (2005). Application of lean manufacturing principles to construction. Lean Construction Journal, 2, 51-54. https://doi.org/10.60164/40g1a6i4g [Google Scholar]
- Ekanayake, E. M. A. C., & Sandanayake, Y. (2016). Synergy between Lean and Value Engineering concepts: Sri Lankan construction industry perspective. The 5th World Construction Symposium 2016: Greening Environment, Eco Innovations & Entrepreneurship, Colombo, Sri Lanka. [Google Scholar]
- Ekanayake, E. M. A. C., & Sandanayake, Y. G. (2017). LiVE approach: Lean integrated Value Engineering for construction industry. Built Environment Project and AssetManagement, 7(5), 518-533. https://doi.org/10.1108/BEPAM-11-2016-0071 [Google Scholar]
- Ellis, R. C. T., Wood, G. D., & Keel, D. A. (2005). Value management practices of leading UK cost consultants. Construction Management and Economics, 23(5), 483-493. https://doi.org/10.1080/01446190500040711 [Google Scholar]
- El-Senoussi, H. M. (2000). Intelligent Computer System for Enhancing Value Engineering Implementation in the Egyptian Construction Industry. The American University in Cairo. [Google Scholar]
- Gahlan, A. (2018). Value Engineering in Construction Between Theory and Practice. Metropolia University of Applied Sciences. [Google Scholar]
- Garbie, I. H. (2010). Enhancing the performance of industrial firms through implementation of lean techniques. In IIE Annual Conference and Expo 2010 Proceedings Institute of Industrial Engineers. [Google Scholar]
- Garcés, G., & Pena, C. (2023). Una revision sobre Lean Construction para la Gestion de Proyectos de Construccion. Revista Ingenieria de Construction, 38(1). https://doi.org/10.7764/RIC.00051.21 [Google Scholar]
- Gillier, T., Hooge, S., & Piat, G. (2015). Framing value management for creative projects: An expansive perspective. International Journal of Project Management, 33(4), 947-960. https://doi.org/10.1016/j.ijproman.2014.11.002 [Google Scholar]
- Gumede, N. P., & Hattingh, T. (2020). Establishing a selection framework for a lean and value engineering hybrid methodology. South African Journal of Industrial Engineering, 31(4). https://doi.org/10.7166/31-4-2299 [Google Scholar]
- Invernizzi, D. C., Locatelli, G., Grönqvist, M., & Brookes, N. J. (2019). Applying value management when it seems that there is no value to be managed: The case of nuclear decommissioning. International Journal of Project Management, 37(5), 668-683. https://doi.org/10.1016/j.ijproman.2019.01.004 [Google Scholar]
- Issa, U. H. (2013). Implementation of lean construction techniques for minimizing the risks effect on project construction time. Alexandria Engineering Journal, 52(4), 697-704. https://doi.org/10.1016Zj.aej.2013.07.003 [Google Scholar]
- Kelly, J., Male, S., & Graham, D. (2015). Value Management of Construction Projects: Second Edition (p. 546). John Wiley & Sons. https://doi.org/10.1002/9781119007258 [Google Scholar]
- Kim, S.-Y., Lee, Y.-S., Nguyen, V., & Luu, T. V. (2016). Barriers to Applying Value Management in the Vietnamese Construction Industry. Journal of Construction in Developing Countries, 21(2), 55-80. https://doi.org/10.21315/jcdc2016.21.2.4 [Google Scholar]
- Lin, X., Mazlan, A. N., Ismail, S., Hu, L., Kasiman, E. H. B., & Yahya, K. (2023). Status of value management studies in construction projects: A systematic review. Ain Shams Engineering Journal, 14(1), 101820. https://doi.org/10.1016/j.asej.2022.101820 [Google Scholar]
- Lu, P., Guo, S., Qian, L., He, P., & Xu, X. (2015). The effectiveness of contractual and relational governances in construction projects in China. International Journal of Project Management, 33(1), 212-222. https://doi.org/10.1016/j.ijpro- man.2014.03.004 [Google Scholar]
- Mahinkanda, M. M. M. P., Sandanayake, Y. G., University of Moratuwa, & Ekanayake, B. J. (2019). Bridging the theory-practice gap in value management in Sri Lankan construction industry. Proceedings of the 8th World Construction Symposium, 147-157. https://doi.org/10.31705/WCS.2019.15 [Google Scholar]
- Mandelbaum, J., Williams, H., & Hermes, A. (2010). Value Engineering Synergies with Lean Six Sigma. The Institute for Defense Analyses. [Google Scholar]
- Mandujano R, M. G., Alarcon, L., Kunz, J., & Mourgues, C. (2016). Identifying Waste in Virtual Design and Construction Practice from a Lean Thinking Perspective: A Meta-Analysis of the Literature. Revista de La Construction, 15(3), 107118. [Google Scholar]
- Maske, N. B., & Valunjkar, S. (2020). Deployment of lean construction methodologies for minimizing time and cost of the project. ICACSE-2020, GCE KARAD and REC AZAMGARH, Karad, India. [Google Scholar]
- Musa, M., Pasquire, C., & Hurst, A. (2016). Where lean construction and value management meet. Proceedings 24th Ann. Conf. of the Int 'l. Group for Lean Construction, 103-112. [Google Scholar]
- Nwaki, W., Eze, E., & Awodele, I. (2021). Major Barriers Assessment of Lean Construction Application in Construction Projects Delivery. CSID Journal of Infrastructure Development, 4(1), 63. https://doi.org/10.32783/csid-jid.v4i1.206 [Google Scholar]
- Othman, I., Kineber, A. F., Oke, A. E., Zayed, T., & Buniya, M. K. (2021). Barriers of value management implementation for building projects in Egyptian construction industry. Ain Shams Engineering Journal, 12(1), 21-30. https://doi.org/10.1016/j.asej.2020.08.004 [Google Scholar]
- Perera, S., Hayles, C., & Kerlin, S. (2011). An analysis of value management in practice: The case of Northern Ireland's construction industry. Journal of Financial Management of Property and Construction, 16, 94-110. https://doi.org/10.1108/13664381111153097 [Google Scholar]
- Rajab, O. (2022, September 29). Lean Construction. The Eighth Jordan International Civil Engineering Conference (JICEC8), Jordan. [Google Scholar]
- Salem, O., Solomon, J., Genaidy, A., & Luegring, M. (2005). Site implementation and assessment of lean construction techniques. Lean Construction Journal, 2(2). https://doi.org/10.60164/e2i9e2h1d [Google Scholar]
- Senay, Atabay & Niyazi, Galipogullari. (2013). Application of Value Engineering in Construction Projects. Journal of Traffic and Transportation Engineering, 1(12). https://doi.org/10.17265/2328-2142/2013.12.005 [Google Scholar]
- Sik-wah Fong, P., Shen, Q., & Cheng, E. W. L. (2001). A framework for benchmarking the value management process. Benchmarking: An International Journal, 8(4), 306-316. https://doi.org/10.1108/14635770110403800 [Google Scholar]
- Soliman, M. (2014). Risk management in international construction joint ventures in Egypt [University of Leeds]. https://etheses.whiterose.ac.uk/7432/ [Google Scholar]
- Tauriainen, M., Marttinen, P., Dave, B., & Koskela, L. (2016). The Effects of BIM and Lean Construction on Design Management Practices. Procedia Engineering, 164, 567-574. https://doi.org/10.1016/j.proeng.2016.11.659 [Google Scholar]
- Thneibat, M., Thneibat, M., & Al-Tamimi, B. (2022). Establishing the synergy between the perceptions of construction professionals and the phases of value management. Engineering, Construction and Architectural Management, 29(4), 18351860. https://doi.org/10.1108/ECAM-11-2020-0987 [Google Scholar]
- Tzortzopoulos, P., Kagioglou, M., & Koskela, L. (2020). Lean Construction: Core Concepts and New Frontiers. Routledge. [Google Scholar]
- VM Guide: A Guide to the Value Methodology Body of Knowledge. (2020). SAVE International. [Google Scholar]
- Wixson, J. R. (2005). Value Analysis/Value Engineering: The Forgotten Lean Technique. [Google Scholar]
- Womack, J., & Jones, D. (1996). Lean Thinking: Banish Waste and Create Wealth in Your Corporation. In Journal of the Operational Research Society (Vol. 48). https://doi.org/10.1038/sj.jors.2600967 [Google Scholar]
- Zhang, X., Mao, X., & Abourizk, S. (2009). Developing a knowledge management system for improved value engineering practices in the construction industry. Automation in Construction, 18, 777-789. https://doi.org/10.1016/j.autcon.2009.03.004 [Google Scholar]
- Zhang, X., Mao, X., & AbouRizk, S. M. (2009). Developing a knowledge management system for improved value engineering practices in the construction industry. Automation in Construction, 18(6), 777-789. https://doi.org/10.1016/j.autcon.2009.03.004 [Google Scholar]
- Zimmerman, L. W., & Hart, G. D. (1982). Value Engineering: A Practical Approach for Owners, Designers, and Contractors. Van Nostrand Reinhold Co. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.

