Open Access
Issue
MATEC Web Conf.
Volume 402, 2024
The 4th International Conference on Engineering, Technology, and Innovative Researches (The 4th ICETIR 2022)
Article Number 04002
Number of page(s) 8
Section Civil Engineering
DOI https://doi.org/10.1051/matecconf/202440204002
Published online 23 August 2024
  1. H. Doloi, A. Sawhney, K. C. Iyer, and S. Rentala, “Analysing factors affecting delays in Indian construction projects,” International Journal of Project Management, vol. 30, no. 4, 2012, doi: 10.1016/j.ijproman.2011.10.004. [Google Scholar]
  2. Y. Hernandi and J. S. Tamtana, “Faktor-Faktor yang Mempengaruhi Produktivitas Pekerja pada Pelaksanaan Konstruksi Gedung Bertingkat,” JMTS: Jurnal Mitra Teknik Sipil, vol. 3, no. 2, 2020, doi: 10.24912/jmts.v3i2.6985. [Google Scholar]
  3. D. W. Halpin and L. S. Riggs, Planning and Analysis of Construction Operations. New York: John Wiley & Sons, 1992. [Google Scholar]
  4. S. P. Dozzi and S. M. Abourizk, “Productivity in Construction,” Ontario, 1993. [Online]. Available: http://lois.justice.gc.ca/fr/showtdm/cs/C-42 [Google Scholar]
  5. J. K. Yates, Productivity improvement for construction and engineering: Implementing programs that save money and time. 2014. doi: 10.1061/9780784413463. [CrossRef] [Google Scholar]
  6. R. Januardi, G. H. Sudibyo, D. N. Saputro, and P. S. Nugroho, “Studi Produktivitas Operasi Konstruksi Pekerjaan Dinding Bata Ringan pada Proyek Gedung Bedah RSUD Banyumas,” in Seminar Nasional Ketekniksipilan, Infrastruktur dan Industri Jasa Konstruksi (KIIJK), 2021, pp. 67–72. [Google Scholar]
  7. V. H. Pranatawijaya, W. Widiatry, R. Priskila, and P. B. A. A. Putra, “Penerapan Skala Likert dan Skala Dikotomi Pada Kuesioner Online,” Jurnal Sains dan Informatika, vol. 5, no. 2, pp. 128–137, Dec. 2019, doi: 10.34128/jsi.v5i2.185. [CrossRef] [Google Scholar]
  8. I. P. Suharto and H. Sulistio, “Produktivitas Pekerja Dalam Pekerjaan Plesteran Dinding Bata Dengan Metode Crew Balance Chart,” JMTS: Jurnal Mitra Teknik Sipil, pp. 1373–1382, 2020. [CrossRef] [Google Scholar]
  9. A. Rajiwate, H. Mirza, S. Kazi, and M. M. Momin, “Productivity improvement by time study and motion study,” International Research Journal of Engineering and Technology, vol. 7, no. 3, 2020. [Google Scholar]
  10. U. Ghani, M. Hayat, Q. S. Khalid, and K. Azam, “Productivity Improvement Through Time and Motion Method,” Int. J. Eng. Technol, vol. 12, no. 2, pp. 108–123, 2020. [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.