  1. M. Nurbanasari. Investigation of leakage on water wall tube in a 660 MW supercritical boiler[J]. Journal of Failure Analysis & Prevention, 2014, 14(5): 657-661. [CrossRef] [Google Scholar]
  2. X.C. Song, X.J.Wu, Y.H. Kang. The method and apparatus of magnetic nondestructive testing for boiler waterwall tube[J]. Key Engineering Materials,2004, 270-273: 642-646. [CrossRef] [Google Scholar]
  3. L.B. Chen. An analysis and investigation on the leakage in water-wall tube of profiled flue of the coalburning boiler[J]. Journal of Shandong University (Engineering Science), 2005, 35(2): 14-17. [Google Scholar]
  4. F. Ren, J. Xu, J. Si. Failure analysis of a water wall tube[C]. Journal of Physics Conference Series, 2020, 1635: 012072. [CrossRef] [Google Scholar]
  5. P. Sun, C.C. Zhao, N. Wu et al. Water Wall Tube Leakage of 600 MW Power Plant Boiler[J]. Foundry Technology, 2017, 38(11): 2664-2666. [Google Scholar]
  6. Y.T.Y an, L.B. Niu, Y.X. Long, et al. Leakage cause analysis on water wall tube of a supercritical 600 MW.e.unit boiler[J]. PTCA (PARTA: PHYS.TEST.), 2019, 55(11): 779-803. [Google Scholar]
  7. National Technical Committee for Steel Standardization. Carbon and low-alloy steel determination of multi-element contents-spark discharge atomic emission spectrometric method (routine method): GB/T 4336-2016[S]. Beijing: China Standards Press, 2016. [Google Scholar]
  8. National Technical Committee for Steel Standardization. Seamless steel tubes and pipes for high pressure boiler: GB/T 5310-2017[S]. Beijing: China Standards Press, 2017. [Google Scholar]
  9. Technical Committee for metal material standards of power station in power industry. Power plant metallographic inspection and assessment guideline: DL/T 884-2019[S]. Beijing: China Electric Power Press, 2019. [Google Scholar]
  10. Y.B. He, W.J. Wang, C.M. Li, et al. Causes and prevention of high temperatures sulfur corrosion of water wall tubes of supercritical concurrent boiler[J]. Electric Power Construction, 2010, 31(10): 61-66. [Google Scholar]
  11. Z. Yin, H. Cai, Z.T. Hou, et al. Study on typical transverse crack of water wall tube of 1000 MW domestic ultra-supercritical units[J]. Journal of Science and Engineering, 2015, 33(03): 442-447. [Google Scholar]
  12. H. Xu, X.H. Xiong, X. Liu, et al. Study on high temperature corrosion products composition of water wall tube in a utility boiler and assessment of reconstruction[J]. Clean Coal Technology, 2019, 25(02): 144-148. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.