Open Access
Issue
MATEC Web Conf.
Volume 282, 2019
4th Central European Symposium on Building Physics (CESBP 2019)
Article Number 02013
Number of page(s) 6
Section Regular Papers
DOI https://doi.org/10.1051/matecconf/201928202013
Published online 06 September 2019
  1. J.P. Ingham, "Predicting the frost resistance of building stone", Quarterly Journal of Engineering Geology and Hydrogeology, vol. 38, pp. 387-399, 2005. [CrossRef] [Google Scholar]
  2. EN 12371:2010: Natural stone test methods - Determination of frost resistance, 2010. [Google Scholar]
  3. CEN/TS 772-22 Part 22: Methods of test for masonry units - Part 22: Determination of freeze/thaw resistance of clay masonry units, 2006. [Google Scholar]
  4. NBN B05-203 Resistance of building materials to freezing and thawing cycles, 1977. [Google Scholar]
  5. ASTM C666/C666M - 15: Standard Test Method for Resistance of Concrete to Rapid Freezing and Thawing, 2015. [Google Scholar]
  6. K.E. Løland, “Continuous damage model for load-response estimation of concrete”, Cement and Concrete Research, vol. 10, pp. 395-402, 1980. [CrossRef] [Google Scholar]
  7. A. Al-Omari, K. Beck, X. Brunetaud, Á. Török, M. Al-Mukhtar. “Critical degree of sa-turation: a control factor of freeze–thaw damage of porous limestones at the Castle of Chambord, France”, Engineering Geology, vol. 185, pp. 71-80, 2015. [CrossRef] [Google Scholar]
  8. J. Kočí, J. Maděra, M. Keppert, R. Černý, “Damage functions for the cold regions and their applications in hygrothermal simulations of different types of building structures”, Cold Regions Science and Technology, vol. 135, pp. 1-7, 2015. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.