Open Access
Issue |
MATEC Web Conf.
Volume 276, 2019
International Conference on Advances in Civil and Environmental Engineering (ICAnCEE 2018)
|
|
---|---|---|
Article Number | 02024 | |
Number of page(s) | 9 | |
Section | Construction Management | |
DOI | https://doi.org/10.1051/matecconf/201927602024 | |
Published online | 15 March 2019 |
- Oxford Economic, Capital project and infrastructure spending outlook to 2025 (Price Waterhouse Coopers, London, 2017) [Google Scholar]
- Databoks, Anggaran infrastruktur 2009-2017 terus meningkat. Available at : http://databoks.katadata.co.id/datapublish/2016/11/03/anggaran-infrastruktur-2009-2017-terus-meningkat (2016) [Google Scholar]
- E.M. Kamal, R. Flanagan, J. of Eng. Design and Tech. 10, 2 (2012) [Google Scholar]
- P.J. Mccord, D.E. Gunderson, Int. J. of Con. Education and Res. 10, 2 (2014) [Google Scholar]
- H. Smyth, S. Pryke, I. Wiley, Collaborative relationships in construction: developing frameworks and networks (Blackwell Publishing, London, 2008) [CrossRef] [Google Scholar]
- P. Humphreys, J. Matthews, M. Kumaraswamy, Supply Chain Management: An Int. J. 8, 2 (2003) [CrossRef] [Google Scholar]
- Australian Bureau of Statistic, Industrial Disputes (Australian Bureau of Statistic, Canberra, 2016) [Google Scholar]
- L.E. Bygballe, A.R. Sward, A.L. Vaagaasar, Int. J. Project Man. 34, 8 (2016) [Google Scholar]
- L.E. Bygballe, M. Jahre, A. Sward, J. of Purchasing and Supply Man.t 16, 4 (2010) [CrossRef] [Google Scholar]
- X. Meng, Int. J. of Project Man. 30, 2 (2012) [CrossRef] [Google Scholar]
- H. Doloi, J. of Man. in Eng. 29, 3 (2013) [Google Scholar]
- Y. Ning, F.Y.Y. Ling, J. of Construction Eng. and Man. 140, 1 (2014) [Google Scholar]
- Y.K.F. Cheung, S. Rowlinson, Int. J. of Man. Science and Business 4, 3 (2011) [Google Scholar]
- G.D. Wood, R.C.T. Ellis, Construction Man. and Econ. 23, 3 (2005) [CrossRef] [Google Scholar]
- Z. Jiang, E. Shiu, S. Henneberg, P. Naude, Psychol Mark 33, 4 (2016) [CrossRef] [Google Scholar]
- M. Babaeianjelodar, Understanding relationship quality in construction projects: A study of the New Zealand construction industry (Research Space, Auckland, 2015) [Google Scholar]
- A.O. Ujene, U.E. Edike, Int. J. of Construction Man. 15, 1 (2015) [CrossRef] [Google Scholar]
- M.B. Jelodar, T.W. Yiu, S. Wilkinson, Int. J. of Project Man. 34, 6 (2016) [Google Scholar]
- D.Y. Lee, P.L. Dawes, J. of Int. Marketing 13, 2 (2005) [Google Scholar]
- C.R. Lages, C. Lages, L.F. Lages, J. of Business Res. 58, 8 (2005) [Google Scholar]
- K. Roberts, S. Varki, R. Brodie, European J. of Marketing 37, 1/2 (2003) [CrossRef] [Google Scholar]
- M.J. Dorsch, S.R. Swanson, S.W. Kelley, J. of The Academy of Marketing 26, 2 (1998) [CrossRef] [Google Scholar]
- D. Bejou, B. Wray, T.N. Ingram, J. of Business Res. 36, 2 (1996) [CrossRef] [Google Scholar]
- M. Bresnen, N. Marshall, ARCOM 14th Annual Conference, University of Reading Proc. 2 (1998) [Google Scholar]
- C. Egbu, P. Bernard, Proc. ARCOM (2000) [Google Scholar]
- H. Smyth, Relationship management and the management of projects (Routledge, Abingdon, 2015) [Google Scholar]
- R.L. Conville, L.E. Rogers, The meaning of relationship in interpersonal communication (Greenwood Publishing Group, London, 1998) [Google Scholar]
- X. Meng, J. of Civil Eng. and Man. 21, 7 (2015) [CrossRef] [Google Scholar]
- H.R. Thomas, C.J. Flynn, Practice Periodical on Struct. Des. and Con. 16, 3 (2011) [Google Scholar]
- D. Willar, Improving quality management system implementation in Indonesian construction companies (Thesis, Queensland University of Technology, Queensland, 2012) [Google Scholar]
- S. McCabe, Quality improvement techniques in construction: principles and methods (Routledge, Abingdon, 2014) [CrossRef] [Google Scholar]
- J. Nummelin, Proc. of the British University in Dubai, Joint Int. Conf. on Construction Culture Innovation and Management: Sustainable (2006) [Google Scholar]
- J. Zuo, Project culture in the Australian construction industry: lessons for China (University of South Australia, Adelaide South Australia, 2008) [Google Scholar]
- J. Zuo, G. Zillante, Int. Journal of Construction Man. 6, 2 (2006) [Google Scholar]
- J. Zuo, G. Zillante, Z.-Y. Zhao, B. Xia, Facilities 32, 13/14 (2014) [Google Scholar]
- K.S. Cameron, R. E. Quinn, Diagnosing and changing organizational culture: Based on competing values framwork. (Jossey-Bass, San Fansisco, 2006) [Google Scholar]
- G.H. Hofstede, Culture’s consequences: comparing values, behaviors, institutions, and organizations across nations (Sage Publication, California, 2001) [Google Scholar]
- E.S. Andersen, Project Man. J. 34, 4 (2003) [CrossRef] [Google Scholar]
- R. Thomas, M. Marosszeky, K. Karim, S. Davis, D. McGeorge, IGLC Proc. 10 (2002) [Google Scholar]
- A. Wiewiora, The role of organisational culture, trust and mechanisms in inter-project knowledge sharing (Thesis, Queensland University of Technology, Queensland, 2011) [Google Scholar]
- B. Egginton, Int. J. of Project Man. 14, 3 (1996) [Google Scholar]
- M. Kumaraswamy, S. Rowlinson, M.M. Rahman, F. Phua, Strategies for triggering the required ‘cultural revolution’ in the construction industry (University of Reading, Berkshire, 2002) [Google Scholar]
- G.A.P.C. Dharmayanti, The impact of organisational culture in project selection process: case of public infrastructure project in Indonesia (Queensland University of Technology, Queensland, 2013) [Google Scholar]
- R. Fellows, A. Liu, Research methods for construction (Willey-Blackwell, Oxford, 2008) [Google Scholar]
- U. Qoyyimah, EFL teachers’ professional dilemmas with moral curriculum reform in Indonesia (Queensland University of Technology, Queensland, 2015) [Google Scholar]
- I. Seidman, Interviewing as qualitative research: A guide for researchers in education and the social sciences (Teachers college press, New York and London, 2013) [Google Scholar]
- A. Witzel, H. Reiter, The problem-centred interview (SAGE, London, 2012) [CrossRef] [Google Scholar]
- Databoks, 101 proyek jokowi untuk perlancar konektivitas. Available at: http://katadata.co.id/infografik/2016/10/22/101-proyek-jokowi-untuk-perlancar-konektivitas (2016) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.