Open Access
Issue |
MATEC Web Conf.
Volume 276, 2019
International Conference on Advances in Civil and Environmental Engineering (ICAnCEE 2018)
|
|
---|---|---|
Article Number | 02017 | |
Number of page(s) | 8 | |
Section | Construction Management | |
DOI | https://doi.org/10.1051/matecconf/201927602017 | |
Published online | 15 March 2019 |
- Komite Percepatan Penyediaan Infrastruktur Prioritas, Laporan Semester KPPIP (KPPIP, 2016) [Google Scholar]
- J. Park, Y.H. Kwak, Int. J. of Project. Man. 35, 3 (2017) [Google Scholar]
- Tweeds, Laxton’s guide to risk analysis and management: in construction (Laxton’s, 1996) [Google Scholar]
- O.S. Cretu, Risk management for design and construction (John Wiley & Sons, 2011) [Google Scholar]
- M. Latham, Constructing the Team (HMSO, 1994) [Google Scholar]
- P. Hibberd, A. Basden, CIB-W92 Procurement Systems Symposium (1996) [Google Scholar]
- T. Wang, W. Tang, D. Qi, W. Shen, J. of Con. Eng. and Man. 142, 4 (2015) [Google Scholar]
- J. Murdoch, W. Hughes, Construction Contracts: Law and Management (Taylor & Francis, 2007) [Google Scholar]
- S.M. Levy, Construction process planning and management: An owner’s guide to succesful projects (Elsevier, 2010) [Google Scholar]
- D. Tran, K. Molenaar, J. of Man. Eng. 30, 2 (2014) [Google Scholar]
- M.C. Friedlander, Risk allocation in design-build construction projects (Schiff Hardin LLP, 2003) [Google Scholar]
- T.C. Tsai, M.L. Yang, J. of OR. Society of Japan (2010) [Google Scholar]
- D. Tran, K. Molenaar, Construction Research Congress (ASCE, 2012) [Google Scholar]
- D.D. Gransberg, J.A. Koch, K. Molenaar, Preparing for design-build projects: A primer for owners, engineers, and contractors (ASCE Press, 2006) [CrossRef] [Google Scholar]
- J.T. O’Connor, G.E. Gibson, J.C. Migliacio Jr., P.P. Shrestha, Organizational structures and communications on the SH 130 project (Center for Transportation Research, Univ. of Texas, 2006) [Google Scholar]
- K.J. Kim, C.A. Kreider, M.D. Valiquette, J. of TRB, 2116, 1 (2009) [Google Scholar]
- H.P. Wood, H. Kassoff, T. McGrath, W.G. Malley, D.C. Rose, N. Skinner, Guide for Managing NEPA-Related and Other Risks in Project Delivery (TRB, 2011) [Google Scholar]
- D.D. Gransberg, K. Molenaar, J. Man. in Eng. 20, 4 (2004) [Google Scholar]
- S. Anderson, K. Molenaar, C. Schexnayder, Guidance for cost estimation and management for highway projects during planning, programming, and preconstruction (TRB, 2007) [Google Scholar]
- M.C. Friedlander, J. Man. in Eng. 14, 6 (1998) [Google Scholar]
- Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia Nomor 19/PRT/M/2015 tentang Standar dan Pedoman Pengadaan Pekerjaan Konstruksi Terintegrasi Rancang dan Bangun (Design and Build) [Google Scholar]
- Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia Nomor 12/PRT/M/2017 tentang Standar dan Pedoman Pengadaan Pekerjaan Konstruksi Terintegrasi Rancang dan Bangun (Design and Build) [Google Scholar]
- X. Zhang, J. of Con. Eng. and Man. 131, 1 (2005) [Google Scholar]
- X. Zhang, J. of Con. Eng. and Man. 132, 2 (2006) [Google Scholar]
- S.M. Levy, Design-build project delivery: managing the building process from proposal through construction (McGraw-Hill Companies, 2006) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.