Open Access
Issue |
MATEC Web Conf.
Volume 270, 2019
The 2nd Conference for Civil Engineering Research Networks (ConCERN-2 2018)
|
|
---|---|---|
Article Number | 05010 | |
Number of page(s) | 8 | |
Section | Construction Engineering and Management | |
DOI | https://doi.org/10.1051/matecconf/201927005010 | |
Published online | 22 February 2019 |
- Asian Development Bank, Loan Indonesia: Tangguh Liquefied Natural Gas Project, Extended Annual Review Report, ADB (2012) [Google Scholar]
- Nomura Research Institute, Study on Opportunities and Issues in introducing mini LNG facilities and equipment in Indonesia, www.meti.go.jp/meti_lib/report/ (2015) [Google Scholar]
- Budisuanda, Advanced & Effective Project Management (2017) [Google Scholar]
- M.Z.A. Majid & R. McCaffer. Factors of non-excusable delays that influence contractors’ performance, Journal of Management in Engineering, ASCE, pp. 42-49 (1998) [Google Scholar]
- A.M. Odeh. & T.B. Hussien. Causes of Construction Delay: Traditional Contracts, Western Michigan University, Kalamazoo, USA (2002) [Google Scholar]
- T.K. Soon. Dispute resolution in relation to delay of Construction projects, Master’s project report submitted to faculty of Civil Engineering, Universiti Technology, Malaysia (2010) [Google Scholar]
- M.M. Kumaraswamy, D.W.M Chan, Contributors to construction delays", CM & E. Vol.16, p. 17-29 (1998) [Google Scholar]
- A. Sugiharto & K. Hampson, Identifying the important causes of Delays in building Construction Projects, Indonesia. Proceedings, 9th East Asia-Pacific Conference on Structural Engineering and Construction, Bali, Indonesia. Accessed from: https://eprints.qut.edu.au/secure/00004156/01/Bali_Conference_2003.doc (2003) [Google Scholar]
- H. Doloi, A. Sawhney, & K.C. Iyer. Structural equation model for investigating factors affecting delay in Indian construction projects, India (2012) [Google Scholar]
- H. Abdul-Rahman, R. Takim, & S.M. Wong, Financial-related causes contributing to project delays, Journal of Retail and Leisure Property. 8, 225-238. doi:http://dx.doi.org/10.1057/rlp.2009.11 (2009) [CrossRef] [Google Scholar]
- W. Alaghbari, M.R.A. Kadir, A. Salim, & Ernawati, The significant factors causing delay of building construction projects in Malaysia, Engineering, Construction and Architectural Management Vol. 14 No. 2, 2007 pp. 192-206 q Emerald Group Publishing Limited 0969-9988 DOI http://dx.doi.org/10.1108/09699980710731308 (2007) [Google Scholar]
- R.B. Kline. Methodology in the social sciences. Principles and practice of structural equation modeling (2nd ed.). New York, NY, US: Guilford Press (2005) [Google Scholar]
- D.L. Jackson, J.A., Jr Gillaspy, & R. Purc-Stephenson. Reporting practices in confirmatory factor analysis: An overview and some recommendations Psychological Methods, 14(1), 6-23. http://dx.doi.org/10.1037/a0014694 (2009) [Google Scholar]
- M.D.M. Islam & O.O. Faniran, Structural equation model of project planning effectiveness, Con Mgmt & Ecom 23(2):215-223 • February 2005 DOI: http://dx.doi.org/10.1080/0144619042000301384 (2005) [CrossRef] [Google Scholar]
- B.M. Byrne, Structural equation modeling with AMOS, (2nd ed.), New York: Routledge (2010) [Google Scholar]
- S. Santoso. AMOS 22 untuk Struktural Equation modeling, Indonesia (2015) [Google Scholar]
- D.A.R. Dolage & D.LG. Rathnamali., Causes of Time Overrun in Construction Phase of Building Projects A Case Study on Department of Engineering Services of Sabaragamuwa Provincial Council, The Institution of Engineers, Sri Lanka (2013) [Google Scholar]
- S. Shanmugapriya, & K. Subramanian, Investigation of Significant Factors Influencing Time and Cost Overruns in Indian Construction Projects, India (2013) [Google Scholar]
- V. Parath, S.M. Renuka, and U. Gunasekaran. 2012, Causes of Delay in Indian Construction Industry, Applied Mechanics and Materials, Vols. 174-177 pp 2774-2777. DOI 10.4028/www.scientific.net/ [Google Scholar]
- M. Haseeb, Xinhai-Lu, A. Bibi, Maloof-ud-Dyian, W. Rabbani, Problems of projects and effects of delays in the construction industry of Pakistan, Pakistan (2011) [Google Scholar]
- S.C. Chai, & A.M. Yusof, SEM Approach: Reclassifying Housing Delay in Malaysian Housing Industry, Malaysia. Journal of Economics and Business Management, 3(3) March 364-369, DOI: http://dx.doi.org/10.7763/JOEBM.2015.V3.211 (2015) [Google Scholar]
- M. Garbharran, J. Govender, & T. Msani, Critical successful factors influencing project success in the construction industry, Acta Structilia 19(2) 90-109 (2012) [Google Scholar]
- H. Doloi, A. Sawhney, & K.C. Iyer. Structural equation model for investigating factors affecting delay in Indian construction projects, India (2012) [Google Scholar]
- H. Doloi. Understanding Impacts of Time and Cost Related Construction Risks on Operational Performance of PPP projects, International of Strategic Property Management, 16 (3) 316-337 http://dx.doi.org/10.3846/1648715X.2012.688774| (2012) [CrossRef] [Google Scholar]
- J.B. Yang & SF Ou. Using structural equation modelling to analyse relationships among key causes of delay in construction, Canada (2008) [Google Scholar]
- Wise Global Training. Introduction to Oil and Gas Operational Safety, Revision Guide for the NEBOSH International Technical Sertificate in Oil and Gas Operational Safety, Routledge (2015) [Google Scholar]
- A. Khalique, Basic Offshore Safety: Safety induction and emergency training for new entrants to the offshore Oil and Gas Industry, Routledge (2016) [Google Scholar]
- P. Christensen, & L.R. Dysert. AACE International Recommended Practice No. 18R-97, Cost Estimate Classification System - As Applied in Engineering, Procurement, and Construction for the Process Industries TCM Framework: 7.3 - Cost Estimating and Budgeting, AACE International (2005) [Google Scholar]
- S.M. Levy and A.M. Civitello. Construction Operations Manual: Policies and Procedures, 5th ed. McGrawHill (2014) [Google Scholar]
- P.F. Kaming, P.O. Olomolaiye, G.D. Hold, & F.C. Harris. Factors influencing construction time and cost overruns on high-rise projects in Indonesia, Construction Management & Economics. Jan1997, Vol. 15 Issue 1, p83-94. 12p. 14 Charts. DOI: http://dx.doi.org/10.1080/014461997373132. (1997) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.