Open Access
Issue |
MATEC Web Conf.
Volume 265, 2019
International Geotechnical Symposium “Geotechnical Construction of Civil Engineering & Transport Structures of the Asian-Pacific Region” (GCCETS 2018)
|
|
---|---|---|
Article Number | 07024 | |
Number of page(s) | 9 | |
Section | Construction Management and Economics | |
DOI | https://doi.org/10.1051/matecconf/201926507024 | |
Published online | 30 January 2019 |
- I.A. Androsova, S.N. Panarin, Optimization of formation of flows for complex teams PMK, Organization and planning of construction production, management of construction organization (1988) [Google Scholar]
- V.P. Astashenkov, Calculation of the optimal order of construction of objects of the town-planning complex, Organization and planning of construction production, management of the construction organization (1988) [Google Scholar]
- V.A. Afanasyev, A.V. Afanasyev, Formation, calculation and optimization of flows with limited initial data, Organization and planning of construction production, management of a construction organization (1988) [Google Scholar]
- P. Oleinik, A. Yurgaytis, MATEC Web of Conferences 117 (2017) [Google Scholar]
- D. Topchiy, A. Shatrova, A. Yurgaytis, MATEC Web of Conferences 193 (2018) [Google Scholar]
- P. Oleinik, A. Yurgaytis, MATEC Web of Conferences 193 (2018) [Google Scholar]
- M. Rogalska, W. Bozejko, Z. Hejducki, Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling, Automation in Construction (2008) [Google Scholar]
- W. Bozejko, Z. Hejducki, M. Uchroński, M. Wodecki, Journal of Civil Engineering and Management (2014) [Google Scholar]
- W. Bozejko, Z. Hejducki, M. Wodecki, Journal of Civil Engineering and Management (2012) [Google Scholar]
- M. Rogalska, W. Bozejko, Z. Hejducki, M. Wodecki, Development of time couplings method using evolutionary algorithms, ISARC 2008 Proceedings from the 25th International Symposium on Automation and Robotics in Construction (2008) [Google Scholar]
- M. Rogalska, Z. Hejducki, Journal of Civil Engineering and Management (2007) [Google Scholar]
- Z. Hejducki, M. Rogalska, Journal of Civil Engineering and Management (2005) [Google Scholar]
- Z. Hejducki, Sequencing problems in methods of organizing construction processes (Engineering, Construction and Architectural Management, 2004) [Google Scholar]
- Z. Hejducki, Journal of Civil Engineering and Management (2003) [Google Scholar]
- Z. Hejducki, J. Mrozowicz, Stream methods of construction work organization: An introduction to the problem (Engineering, Construction and Architectural Management, 2001) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.