Open Access
Issue |
MATEC Web Conf.
Volume 258, 2019
International Conference on Sustainable Civil Engineering Structures and Construction Materials (SCESCM 2018)
|
|
---|---|---|
Article Number | 02026 | |
Number of page(s) | 11 | |
Section | Construction Management, Construction Method and System, Optimization and Innovation in Structural Design | |
DOI | https://doi.org/10.1051/matecconf/201925802026 | |
Published online | 25 January 2019 |
- K.M. El-Gohary, R.F. Aziz, Factors Influencing Construction Labor Productivity in Egypt, J. Manage. Eng., 30(1), 1–9 (2014). [Google Scholar]
- R. Ratnayanti, Produktivitas Tenaga Kerja Konstruksi pada Setiap Jenjang Keahlian di Lapangan, Jurnal Teknik Sipil ITB, Bandung (2003). [Google Scholar]
- H.S. Park, S.R. Thomas, R.L. Tucker, Benchmarking of Construction Productivity, J. Constr. Eng. Manage., 131(7), 772–778 (2005). [CrossRef] [Google Scholar]
- K.P. Grant, J.S. Pennypacker, Project Management Maturity : An Assesment of Project Management Capabilities Among and Between Selected Industries, IEEE Transaction on Engineering Management, 53 No.1, hal. 59–68 (2006). [Google Scholar]
- A.A. Tsehayae, A.R. Fayek, Developing and Optimizing Context-Specific Fuzzy Inference System-Based Construction Labor Productivity Models, J. Constr. Eng. Manage., 142 (7), 04016017 (2016). [CrossRef] [Google Scholar]
- N. Brookes, M. Butler, P. Dey, R. Clark, The Use of Maturity Models in Improving Project Management Performance, International Journal of Managing Project in Business, 7 No.2, hal.231–246 (2014). [CrossRef] [Google Scholar]
- D. Hillson, Assesing Organisational Project Management Capability, Journal of Facilities Management, 2 No.3, hal.298–311 (2003). [CrossRef] [Google Scholar]
- S. Durdyev, S. Ismail, On-site construction productivity in Malaysian infrastructure projects, Structural Survey, 34 No. 4/5 (2016). [Google Scholar]
- R. Hughes, D. Thorpe, A review of enabling factors in construction industry productivity in an Australian environment, Construction Innovation, 14 No. 2 (2014). [Google Scholar]
- M. Zakeri, P.O. Olomolaiye, G.D. Holt, F.C. Harris, A survey of constraints on Iranian construction operatives’ productivity, J. Constr. Manage. Econ., 14(5), 417–426 (1996). [CrossRef] [Google Scholar]
- M. Liberda, J. Rawanpura, G. Jergeas, Construction Productivity Improvement: A Study of Human, Management and External Issues, Construction Research Congress (2004). [Google Scholar]
- J. Ravianto, Produktivitas dan Teknologi, Lembaga Sarana Informasi dan Produktivitas, Jakarta. 1985 (1985). [Google Scholar]
- M. Sinungan, Produktivitas Apa dan Bagaimana, Jakarta, PT. Bumi Aksara (2000). [Google Scholar]
- V. Gasper, Manajemen Produktivitas Total Strategi Peningkatan Produktivitas Bisnis Global, Jakarta. PT. Gramedia Pustaka Utama (2000). [Google Scholar]
- Asiyanto, Manajemen Produksi untuk Jasa Konstruksi, Jakarta, Pradnya Paramita (2005). [Google Scholar]
- I.W. Ervianto, Manajemen Proyek Konstruksi, Edisi Revisi, Penerbit Andi, Yogyakarta (2005). [Google Scholar]
- E.C. Lim, J. Alum, Construction productivity: Issues encountered by contractors in Singapore, Int. J. Proj. Manage., 13(1), 51–58 (1995). [CrossRef] [Google Scholar]
- D.W. Halligan, L.A. Demsetz, J.D. Brown, C.B. Pace, Action-response model and loss of productivity in construction, J. Constr. Eng. Manage., 120:1(47), 47–64 (1994). [CrossRef] [Google Scholar]
- J. Hansen, E. Mowen, Management Accounting, Southwestern College Publishing. Cincinnati, Ohio (1997) [Google Scholar]
- P.F. Kaming, P.O. Olomolaiye, G.D. Holt, F.C. Harris, Factors influencing craftsmen’s productivity in Indonesia, Int. J. Proj. Manage., 15(1), 21–30 (1997) [CrossRef] [Google Scholar]
- P. Soekirno, Pengantar Manajemen Proyek, Diktat Kuliah Magister Teknik Sipil UII, Yogyakarta (1999) [Google Scholar]
- I. Dipohusodo, Manajemen Proyek dan Konstruksi, Kanisius, Yogyakarta (1996) [Google Scholar]
- M. Liu, G. Ballard, W. Ibbs, Work flow variation and labor productivity: Case study, J. Manage. Eng., 236–242 (2011) [CrossRef] [Google Scholar]
- G. Jargeas, Improving Construction Productivity on Alberta Oil and Gas Capital Projects, Alberta Finance and Enterprise, Canada (2009) [Google Scholar]
- H. Maylor, Project Management, Edisi ke-4, Harlow: Pearson Education (2010) [Google Scholar]
- I. Widiasanti, Lenggogeni, Manajemen Konstruksi, hal.25, Penerbit PT Remaja Rosdakarya, Bandung (2014) [Google Scholar]
- Ng.S. Thomas, R.M. Skitmore, K.C. Lam, A.W.C. Poon, Demotivating factors influencing the productivity of civil engineering projects, Project Management, 139–146 (2004) [Google Scholar]
- S. Mohammed, Benchmarking and improving construction productivity, Benchmarking for Quality Management & Technology, 3 No. 3 pp. 50–58 (1996) [CrossRef] [Google Scholar]
- R.M.W. Horner, B.T. Talhouni, H.R. Thomas, Preliminary results of major labour productivity monitoring programme, Proc., 3rd Yugoslavian Symp. on Construction Management, Zagreb Univ., Croatia, 18–28 (1989). [Google Scholar]
- A. Enshassi, S. Mohamed, Z.A. Mustafa, P.E. Mayer, Factors Affecting Labor Productivity in Building Project in Gaza Strip, Journal of Civil Engineering and Management, 15(3) : 269–280. Vol. 13 No. 4, pp. 245-254 (2007) [Google Scholar]
- H.M. Alinaitwe, J.A. Mwakali, B. Hansson, Factors affecting the productivity of building craftsmen- Studies of Uganda, J. Civ. Eng. Manage., 13(3), 169–176 (2007) [Google Scholar]
- A. Makulsawatudom, M. Emsley, K. Sinthawanarong, Critical factors influencing construction productivity in Thailand, J. King Mongkut’s Univ. Technol., 14(3), 1–6 (2004) [Google Scholar]
- K. Abdul, W.P. Lee, M.S. Jaafar, S.M. Sapuan, A.A.A. Ali, Factors affecting construction labour productivity for Malaysian residential projects, J. Struct. Surv., 23(1), 42–54 (2005) [CrossRef] [Google Scholar]
- A.M. Jarkas, C.G. Bitar, Factors Affecting Construction Labor Productivity in Kuwait, Journal of Construction Engineering Management, 20(10), 811–820. (2012) [Google Scholar]
- P.F. Kaming, P.O Olomolaiye, G.D. Holt, F.C. Harris, Factors influencing craftsmen’s productivity in Indonesia, Int. J. Proj. Manage., 15(1), 21–30 (1997) [CrossRef] [Google Scholar]
- J. Heizer, B. Render, Operations Management, Jakarta, Salemba Empat (2006) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.