Open Access
Issue
MATEC Web Conf.
Volume 228, 2018
2018 3rd International Conference on Circuits and Systems (CAS 2018)
Article Number 01001
Number of page(s) 5
Section Intelligent Computing and Information Processing
DOI https://doi.org/10.1051/matecconf/201822801001
Published online 14 November 2018
  1. L. S. Jin, J. S. Mu, Specifications for Coal Pillar Preservation and Compressed Coal Mining for Buildings, Water Bodies, Railways and Main Shafts. China Coal Industry Publishing House, Beijing (2000). [Google Scholar]
  2. D. A. Singer, Progress in Integrated Quantitative Mineral Resource Evaluations. Ore Geology Reviews, 38(3): 242-250 (2010). [CrossRef] [Google Scholar]
  3. W. D. Wang, Y. P. Li, Error of Geological Ore Block Method for Coal Resources/Reserves Estimation and Improvement Method. Coal Geology & Exploration, 42(5): 1-3 (2014). [Google Scholar]
  4. X. Luoa, R. Dimitrakopoulos, Data-driven Fuzzy Analysis in Quantitative Mineral Resource Evaluation. Computers and Geosciences, 29(1): 3-13 (2003). [CrossRef] [Google Scholar]
  5. D. H. Liu, Y. Q. Xing, D. D. Zhai, Technique Research on Mineral deposits Overlaid by Building engineerings-Taking General Main Canal in Phase I Project of the South-to-North Water Transfer Middle Line as An Example. Henan Science, 28(9): 1182-1188 (2010). [Google Scholar]
  6. K. Q. Li, Q. Zhang, F. Wu, Accounting Method of the Environmental Reparation Value in Mineral deposits Developing. Advanced Materials Research, 807-809: 2421-2426 (2013). [CrossRef] [Google Scholar]
  7. S. H. Zhang, Research on Investigation and Evaluation Methods of Mineral deposits Overlaid by Building engineerings. Resources Environment & Engineering, 26(3): 278-280 (2012). [Google Scholar]
  8. X. B. Yue, Z. P. Shuai, J. X. Wang, Research on Evaluation Methods of Mineral deposits Overlaid by Building engineerings. Yangtze River, 44(6): 44-46 (2013). [Google Scholar]
  9. Y. H. Meng, The estimation of mineral deposits reserves in the coal mine building engineering-Taking the building engineering of a coal mine industrial square as an example. Shandong Coal Science and Technology, 11, 34-36 (2016). [Google Scholar]
  10. X. D. Liu, S. H. Zuo, H. S. Cao, Determination of the protective coal pillar in pressed mineral deposits estimation. Shaanxi Meitan, 1, 89-91 (2015). [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.