Open Access
Issue
MATEC Web Conf.
Volume 197, 2018
The 3rd Annual Applied Science and Engineering Conference (AASEC 2018)
Article Number 14002
Number of page(s) 5
Section Industry Engineering
DOI https://doi.org/10.1051/matecconf/201819714002
Published online 12 September 2018
  1. S. Zhou, X. Li, H. Chen, and C. Guo, Minimizing makespan in a no-wait flowshop with two batch processing machines using estimation of distribution algorithm, Int. J. Prod. Res., vol. 54, no. 16, pp. 4919-4937, (2016) [CrossRef] [Google Scholar]
  2. T. C. E. Cheng, J. N. D. Gupta, and G. Q. Wang, A review of flowshop scheduling research with setup times, Prod. Oper. Manag., vol. 9, no. 3, pp. 262-282, (2000) [Google Scholar]
  3. B. M. T. Lin and T. C. E. Cheng, Batch scheduling in the no-wait two-machine Flowshop to minimize the makespan, Comput. Oper. Res., vol. 28, pp. 613-624, (2001) [CrossRef] [Google Scholar]
  4. T. C. E. Cheng, M. Y. Kovalyov, and K. N. Chakhlevich, Batching in a two-stage flowshop with dedicated machines in the second stage, IIE Trans. Institute Ind. Eng., vol. 36, no. 1, pp. 87-93, (2004) [CrossRef] [Google Scholar]
  5. B. M. T. Lin and T. C. E. Cheng, Two-machine flowshop batching and scheduling, Ann. Oper. Res., vol. 133, no. 1-4, pp. 149-161, (2005) [CrossRef] [Google Scholar]
  6. C. T. Ng and M. Y. Kovalyov, Batching and scheduling in a multi-machine flow shop, J. Sched., vol. 10, no. 6, pp. 353-364, (2007) [CrossRef] [Google Scholar]
  7. L. Tang and P. Liu, Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration, Appl. Math. Model., vol. 33, no. 2, pp. 1187-1199, (2009) [CrossRef] [MathSciNet] [Google Scholar]
  8. H. Gong, L. Tang, and C. W. Duin, A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times, Comput. Oper. Res., vol. 37, no. 5, pp. 960-969, (2010) [CrossRef] [Google Scholar]
  9. L. Shen and U. Buscher, Solving the serial batching problem in job shop manufacturing systems, Eur. J. Oper. Res., vol. 221, no. 1, pp. 14-26, (2012) [CrossRef] [Google Scholar]
  10. L. Shen, J. N. D. Gupta, and U. Buscher, Flow shop batching and scheduling with sequence-dependent setup times, J. Sched., vol. 17, no. 4, pp. 353-370, (2014) [CrossRef] [Google Scholar]
  11. M. D. Astuti and A. H. Halim, Model Penjadwalan Pada Batch Processor Tunggal Dengan Waktu Proses Total Waktu Tinggal Aktual, J. Rekayasa Sist. Ind., vol. 4, no. 1, pp. 62-67, (2017) [Google Scholar]
  12. J. M. Yu, R. Huang, and D. H. Lee, Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops, Int. J. Prod. Res., vol. 55, no. 11, pp. 3266-3282, (2017) [CrossRef] [Google Scholar]
  13. C. S. T. Javad H. Ahmadi, Reza J. Ahmadi, Sriram dasu, Batching and Scheduling Jobs and Discrete Processors, Oper. Res., vol. 39, no. August 2015, pp. 750-763, (1992) [CrossRef] [Google Scholar]
  14. Y. Mauluddin and H. Halim, Model Penjadwalan Job yang Diproses Serial pada Mesin Pengolah Batch dan Pengolah Job, pp. 392-401. (2005) [Google Scholar]
  15. A. Oulamara, G. Finke, and A. Kamgaing Kuiteing, Flowshop scheduling problem with a batching machine and task compatibilities, Comput. Oper. Res., vol. 36, no. 2, pp. 391-401, (2009) [CrossRef] [Google Scholar]
  16. Y. Fang, X. Lu, and P. Liu, Online batch scheduling on parallel machines with delivery times, Theor. Comput. Sci., vol. 412, no. 39, pp. 5333-5339 (2011) [CrossRef] [Google Scholar]
  17. J. Behnamian, S. M. T. Fatemi Ghomi, F. Jolai, and O. Amirtaheri, Realistic two-stage flowshop batch scheduling problems with transportation capacity and times, Appl. Math. Model., vol. 36, no. 2, pp. 723-735 (2012) [CrossRef] [Google Scholar]
  18. S. Li, Parallel batch scheduling with inclusive processing set restrictions and non-identical capacities to minimize makespan, Eur. J. Oper. Res., vol. 260, no. 1, pp. 12-20, (2017) [CrossRef] [Google Scholar]
  19. R. Zhang, P. C. Chang, S. Song, and C. Wu, A multi-objective artificial bee colony algorithm for parallel batch-processing machine scheduling in fabric dyeing processes, Knowledge-Based Syst., vol. 116, pp. 114-129, (2017) [CrossRef] [Google Scholar]
  20. O. Shahvari and R. Logendran, An Enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizes, Comput. Oper. Res., vol. 77, pp. 154-176, (2017) [CrossRef] [Google Scholar]
  21. Y. Tan, L. Mönch, and J. W. Fowler, A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines, J. Sched., pp. 1-18, (2017) [Google Scholar]
  22. B. Shahidi-Zadeh, R. Tavakkoli-Moghaddam, A. Taheri-Moghadam, and I. Rastgar, Solving a bi-objective unrelated parallel batch processing machines scheduling problem: A comparison study, Comput. Oper. Res., 88, pp. 71-90, (2017) [CrossRef] [Google Scholar]
  23. M. A. Ramdhani, H. Aulawi, A. Ikhwana, and Y. Mauluddin, Model of green technology adaptation in small and medium-sized tannery industry, J. Eng. Appl. Sci., 12, no. 4, pp. 954-962, (2017) [Google Scholar]
  24. E. R. Wulan, M. A. Ramdhani, and Indriani, Determine the Optimal Solution for Linear Programming with Interval Coefficients IOP Conf. Ser. Mater. Sci. Eng., vol. 288, no. 1, pp. 1-6, (2018) [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.