Open Access
Issue
MATEC Web Conf.
Volume 195, 2018
The 4th International Conference on Rehabilitation and Maintenance in Civil Engineering (ICRMCE 2018)
Article Number 06015
Number of page(s) 8
Section Construction Management and Maintenance
DOI https://doi.org/10.1051/matecconf/201819506015
Published online 22 August 2018
  1. R. Vrijhoef, L. Koskela, Eur. J. Purch. Supply Manag., 6 169-178 (2000). [CrossRef] [Google Scholar]
  2. L. Bankvall, L.E. Bygballe, A. Dubois, M. Jahre, Supply Chain Manag., 15 385-393 (2010). [CrossRef] [Google Scholar]
  3. A. Akintoye, J. Main, Eng. Construct. Architect. Manag., 14 597-617 (2007). [CrossRef] [Google Scholar]
  4. M.A. Wibowo, M.N. Sholeh, Procedia Engineering, 125 25-31(2015). [CrossRef] [Google Scholar]
  5. X. Xue, Y. Wang, Q. Shen, X. Yu, Int. J. Proj. Manag., 25 150-157 (2007). [CrossRef] [Google Scholar]
  6. M.A. Wibowo, M.N. Sholeh, 2nd International Conference on Civil Engineering Research 2016, Sepuluh Nopember Institute of Technology. [Google Scholar]
  7. B. Ritchie, C. Brindley, Int. J. Oper. Prod. Man., 27 303-322 (2007). [Google Scholar]
  8. H. Ke, Z. Cui, K. Govindan, E.K. Zavadskas, Eng. Econ., 26 349-363 (2015). [Google Scholar]
  9. P. Erik Eriksson, Supply Chain Manag., 15 394-403 (2010). [CrossRef] [Google Scholar]
  10. N. Ishii, Y. Takano, M. Muraki, Int. J. Proj. Manag., 32 519-528 (2014). [CrossRef] [Google Scholar]
  11. D. Seth, N. Seth, D. Goel, Int. J. Manuf. Tech. Manag., 19 529-550 (2008). [CrossRef] [Google Scholar]
  12. F.A. Abdulmalek, J. Rajgopal, Int. J. Prod. Econ., 107 223-236 (2007). [Google Scholar]
  13. D. Seth*, V. Gupta, Prod. Plan. Control, 16 44-59 (2005). [CrossRef] [Google Scholar]
  14. A. Segerstedt, T. Olofsson, Supply Chain Manag., 15 347-353 (2010). [CrossRef] [Google Scholar]
  15. V. Bychkov, M. Faessler, R. Geyer, N. Gorbacheva, Y.V. Gousakov, C. Ilgner, Part. Nucl. Lett, 111 64-73 (2002). [Google Scholar]
  16. E. Papadonikolaki, R. Vrijhoef, H. Wamelink, Management, 631 640 (2015). [Google Scholar]
  17. M.A. Wibowo, M.N. Sholeh, H.S. Adji, Procedia engineering, 171 185-190 (2017). [CrossRef] [Google Scholar]
  18. L.-E. Gadde, A. Dubois, J. Purch. Supply Manag., 16 254-263 (2010). [CrossRef] [Google Scholar]
  19. W.J. O’Brien, K. London, R. Vrijhoef, ICFAI J. Oper. Manag., 3 64-84 (2004). [Google Scholar]
  20. S. Duarte, V. Cruz-Machado, Int. J. Manag. Sci. Eng. Manag., 10 20-29 (2015). [Google Scholar]
  21. K. Yeo, J. Ning, Int. J. Proj. Manag., 20 253-262 (2002). [CrossRef] [Google Scholar]
  22. S. Pryke, Construction supply chain management: Concepts and case studies, John Wiley & Sons, (2009). [Google Scholar]
  23. H. Yu, T. Tweed, M. Al-Hussein, R. Nasseri, J. Cons. Eng. M., 135 782-790 (2009). [CrossRef] [Google Scholar]
  24. F. Pasqualini, P.A. Zawislak, 13th International Group for Lean Construction Conference: Proceedings, International Group on Lean Construction, 117 (2005). [Google Scholar]
  25. M.A. Wibowo, N.U. Handayani, A. Nurdiana, M.N. Sholeh, Adv. Sci. Lett., 23 2633-2635 (2017). [CrossRef] [Google Scholar]
  26. P. Fontanini, F.A. Picchi, Proceedings of the 12th Annual Conference of the International Group for Lean Construction (IGLC-12), Elsinore, Denmark, 3-5 (2004). [Google Scholar]
  27. M. Rother, Toyota kata, McGraw-Hill Professional Publishing, (2009). [Google Scholar]
  28. R.J. Arbulu, I.D. Tommelein, Proceedings IGLC, 183-185 (2002). [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.