Open Access
Issue
MATEC Web Conf.
Volume 175, 2018
2018 International Forum on Construction, Aviation and Environmental Engineering-Internet of Things (IFCAE-IOT 2018)
Article Number 04017
Number of page(s) 4
Section Urban Planning, Environment and Construction
DOI https://doi.org/10.1051/matecconf/201817504017
Published online 02 July 2018
  1. Pan Li, Fan Juyu. Garden engineering construction management [M]. Beijing: Peking University press, 2013:7 [Google Scholar]
  2. Wang Shouxu . Highway Construction Organization and Project Budge 3rd[M]. Beijing: China Communications Press, 2007:27-35. [Google Scholar]
  3. The National Construction Enterprise Project Manager Training Textbook Compilation Committee . The Construction Organization Design and Progress Managemen Revised[M]. Beijing: China Architecture and Building Press, 2001: 21-45 [Google Scholar]
  4. Wei Daosheng.Essence of Difference in Flow Duration in Different Flow Construction[J]. Journal of Chongqing Jiaotong University (Natural Science Edition),2013,32 (3):451-452 [Google Scholar]
  5. Cao Hui, Zhang Jiangcheng. Construction Engineering Construction Organization [M]. Beijing:Beijing Publishing House, [Google Scholar]
  6. Li Lan.An Empirical Study on the flow construction Special Problems of Network Planning in Construction Project[J].Building economy, 2013(3):35-38 [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.