Open Access
Issue
MATEC Web Conf.
Volume 175, 2018
2018 International Forum on Construction, Aviation and Environmental Engineering-Internet of Things (IFCAE-IOT 2018)
Article Number 03073
Number of page(s) 9
Section Computer Simulation and Design
DOI https://doi.org/10.1051/matecconf/201817503073
Published online 02 July 2018
  1. W. Sun, X. Ding, J. Wei, X. B. Wang, A. Q. Zhang, 2016, Hierarchical modeling method and dynamic characteristics of cutter head driving system in tunneling boring machine, Tunnelling and Underground Space Technology 52: 99-110. [CrossRef] [Google Scholar]
  2. M. Filbà, J. M. Salvany, J. Jubany, L. Carrasco, 2016, Tunnel boring machine collision with an ancient boulder beach during the excavation of the Barcelona city subway L10 line: A case of adverse geology and resulting engineering solutions, Engineering Geology 200: 31-46. [CrossRef] [Google Scholar]
  3. A. Rahim, H. Zabidi, M. Trisugiwo, A. G. M. Rafek, 2016, Parametric Performance Study of Tunnel Boring Machine (TBM) In the Titiwangsa Main Range Granite, Malaysia, Procedia Chemistry 19: 969-974. [CrossRef] [Google Scholar]
  4. D. Festa, W. Broere, J.W. Bosch, 2015, Kinematic behaviour of a Tunnel Boring Machine in soft soil: Theory and observations, Tunnelling and Underground Space Technology 49: 208-217. [CrossRef] [Google Scholar]
  5. J. Ninić, G. Meschke, 2015, Model update and real-time steering of tunnel boring machines using simulation-based meta models, Tunnelling and Underground Space Technology 45: 138-152. [CrossRef] [Google Scholar]
  6. S. Mahdevari, K. Shahriar, S. Yagiz, M. A. Shirazi, 2014, A support vector regression model for predicting tunnel boring machine penetration rates, International Journal of Rock Mechanics and Mining Sciences 72: 214-229. [CrossRef] [Google Scholar]
  7. M. Entacher, S. Lorenz, R. Galler, 2014, Tunnel boring machine performance prediction with scaled rock cutting tests, International Journal of Rock Mechanics and Mining Sciences 70: 450-459. [CrossRef] [Google Scholar]
  8. P. Jain, A. K. Naithani, T. N. Singh, 2014, Performance characteristics of tunnel boring machine in basalt and pyroclastic rocks of Deccan traps-A case study, Journal of Rock Mechanics and Geotechnical Engineering 6(1): 36-47. [CrossRef] [Google Scholar]
  9. J. Q. E, C. Qian, T. Liu, G. L. Liu, 2014, Research on the Vibration Characteristics of the New Type of Passive Super Static Vibratory Platform Based on the Multiobjective Parameter Optimization, Advances in Mechanical Engineering 6: 1-8. [Google Scholar]
  10. L Gottlieb, 1981, Vibratory cutting of brown coal, International Journal of Rock Mechanics and Mining Sciences & Geomechanics 18(4): 335-339. [CrossRef] [Google Scholar]
  11. Y. C. Jing, 2000, Research of vibration coal cutting mechanism, Beijing: China University of Mining & Technology. [Google Scholar]
  12. T. Muro, D. T. Tran, 2003, Regression analysis of the characteristics of vibrocutting blade for tuffaceous rock, Journal of Terramechanics, 40(3):191-219. [CrossRef] [Google Scholar]
  13. W. M. Zhao, X. B. Zhou, N. L. Lu, Y. S. Li, 2000, Basic Research of Digging Rock and Soil with Vibration, Construction Machinery (6): 56-60. [Google Scholar]
  14. J. X. Zhu. 2008, Study on vibratory excavation mechanism, process optimization modeling and intelligent control strategy of hydraulic excavator, Changsha: Central South University. [Google Scholar]
  15. Z. Q. Luo, H. Y. Zuo, N. Jia, Y. W. Wang, 2013, Instability identification on large scale underground mined-out area in the metal mine based on the improved FRBFNN, International Journal of Mining Science and Technology. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.