Open Access
Issue
MATEC Web Conf.
Volume 251, 2018
VI International Scientific Conference “Integration, Partnership and Innovation in Construction Science and Education” (IPICSE-2018)
Article Number 05040
Number of page(s) 7
Section Management in Construction
DOI https://doi.org/10.1051/matecconf/201825105040
Published online 14 December 2018
  1. W.J. Hopp and M.L. Spearman, (1996). Factory Physics: Foundations of Manufacturing Management. Irwin/McGraw-Hill, Boston, Mass. [Google Scholar]
  2. G. Ballard and G. Howell (1997). “Shielding Production: An Essential Step in Production Control.” ASCE, J. of Constr. Engrg. and Mgmt., 124 (1) 11–17. [CrossRef] [Google Scholar]
  3. A. Hofackerю Bewertung und Einführung von Lean-Methoden in der Einzelund Kleinserienfertigung am Beispiel des Stahlbaus. Dissertationsschrift. – Karlsruhe, 2010. [Google Scholar]
  4. C. Reuter. Logistikrelevante Lösungen auf der Basis von Lean-Management bei kleinen Losgrößen und hoher Variantenvielfalt. Dissertationsschrift. – Stuttgart, 2009. [Google Scholar]
  5. M. Sanchez, M. P., Perez. Lean Indicators and Manufacturing Strategies, International Journal of Operation and Production Management, 2001. 21:1433. [Google Scholar]
  6. C. D. Ray, X. Zuo, J.H. Michael, J. H. Wiedenbeck, J. K. The Lean Index: Operational” Lean” Metrics for The Wood Products Industry, Wood and Fiber Science 2006; 38:238. [Google Scholar]
  7. H. Soriano-Meier, P.L. Forrester. A Model for Evaluating the Degree of Leanness of Manufacturing Firms, Integrated Manufacturing Systems 2002; 13:104. [Google Scholar]
  8. M. Eswaramoorthi, G. R. Kathiresan, P. S. S. Prasad, P. V. Mohanram. A Survey on Lean Practices In Indian Machine Tool Industries, International Journal of Advanced Manufacturing Technology 2011; 52:1091. [CrossRef] [Google Scholar]
  9. J. Metternich, S. Bechtloff, S. Seifermann, Efficiency and Economic Evaluation of Cellular Manufacturing to enable Lean Machining, Procedia CIRP 7 (2013) 592 – 597. [CrossRef] [Google Scholar]
  10. F. Guerriero, J. Miltenburg. The stochastic U-line balancing problem, Naval Research Logistics 50 (1) (2003) 31–57. [CrossRef] [Google Scholar]
  11. Y. Monden. Toyota Production System. Industrial Engineering and Management Press, Norcross, GA 1983. [Google Scholar]
  12. C. Becker, A. Scholl, A survey on problems and methods in generalized assembly line balancing, European Journal of Operational Research 168 (2006) 694–715. [CrossRef] [Google Scholar]
  13. A.H. Fakhimi, J. Majrouhi Sardroud and S. Azhar. How can Lean, IPA and BIM work together? // 33rd International Symposium for Automation and Robotic in Construction (ISARC 2016). [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.