Open Access
Issue |
MATEC Web Conf.
Volume 149, 2018
2nd International Congress on Materials & Structural Stability (CMSS-2017)
|
|
---|---|---|
Article Number | 02009 | |
Number of page(s) | 7 | |
Section | Session 2 : Structures & Stability | |
DOI | https://doi.org/10.1051/matecconf/201814902009 | |
Published online | 14 February 2018 |
- Abdelgader, H., Khatib, J., El-baden, A., Self-Compacting Grout to Produce: Two-Stage Concrete, Proceeding of The 2nd International Sustainable Buildings Symposium, 367-372, Gazi University, Ankara, Turkey, (2015). [Google Scholar]
- ACI Committee (304.1 R-92), Guide for the use of pre-placed aggregate concrete for structural and mass concrete applications: 21-24. Farmington Hills-Michigan: USA, (1997). [Google Scholar]
- Abdelgader, H.S., Effect of quantity of sand on the compressive strength of two-stage concrete. Magazine of Concrete Research 48(3): 353-360, (1996). [CrossRef] [Google Scholar]
- Liu, C., Ahn, C.R., An, X. and Lee, S. Life-cycle assessment of concrete dam construction: comparison of environmental impact of rock-filled and conventional concrete, Journal of Construction Engineering Management, 139(12), (2013). [Google Scholar]
- Samarin, A. Use of concrete as a biological shield from ionising radiation, Energy and Environmental Engineering, 1(2): 90-97 (2013). [Google Scholar]
- ASTM. C33, Specification for concrete aggregates. American Society for Testing and Materials. Philadelphia: Pennsylvania, (1997). [Google Scholar]
- ASTM-C150, Specification for Portland cement. American Society for Testing and Materials. Philadelphia: Pennsylvania, (1994). [Google Scholar]
- Abdelgader, H.S., Elgalhud A. A., Effect of grout pro-portion on strength of two-stage concrete. Structural Concrete Journal 3(3): 163-170, (2008). [Google Scholar]
- ASTM C942. Standard test method for compressive strength of grouts for preplaced-aggregate concrete in the laboratory. American Society for Testing and Materials. Philadelphia: Pennsylvania, (2010). [Google Scholar]
- ASTM C873. Standard test method for compressive strength of concrete cylinders cast in place in cylinder molds. American Society for Testing and Materials. Philadelphia: Pennsylvania, (2010). [Google Scholar]
- ASTM-C496/C496M. Standard test method for splitting tensile strength of cylindrical concrete specimen. American Society for Testing and Materials. Philadelphia: Pennsylvania, (2004). [Google Scholar]
- Abdelgader, H.S., Górski, J. Influence of grout proportions on modulus of elasticity of two-stage concrete. Magazine of Concrete Research 4(5): 251255, (2002). [Google Scholar]
- Abdelgader, H.S., Górski, J. Stress-strain relations and modulus of elasticity of two-stage concrete. ASCE Materials Journal 4(2): 251-255, (2003). [Google Scholar]
- Awal, A.S.M.A. Manufacture and Properties of Prepacked Aggregate Concrete, M.Eng.Sc. Thesis, University of Melbourne, Australia (1985). [Google Scholar]
- Schaefer, R.L. & Anderson, R.B. The student's edition of MINITAB statistical software adapted for education: 5-23. New York: Addison Wesley Company, (1989). [Google Scholar]
- Abdelgader, H.S., How to design concrete produced by a two-stage concreting method. Cement and Concrete Re-search 3 (29): 331-337, (1999). [Google Scholar]
- Iwasaki, N., Predictions of grouting process in prepacked concrete by green's function. Proceeding of Japanese Society of Civil Engineering: 45-50. Tokyo: Japan, (1985). [Google Scholar]
- Awal, A.S.M.A. Failure mechanism of prepacked concrete. ASCE Structural Engineering Journal 3(5): 727-732, (1988). [CrossRef] [Google Scholar]
- Awal, A.S.M.A., Creep recovery of prepacked aggregate concrete, ASCE Journal of Materials in Civil Engineering, 4(3): 320-325, (1992). [CrossRef] [Google Scholar]
- Awal, A.S.M.A., Modulus of elasticity of prepacked aggregate concrete, Journal of Structural Engineering, Madras, India, 15(2) : 65-68, (1988). [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.