Open Access
Issue
MATEC Web Conf.
Volume 87, 2017
The 9th International Unimas Stem Engineering Conference (ENCON 2016) “Innovative Solutions for Engineering and Technology Challenges”
Article Number 01012
Number of page(s) 6
Section Civil Engineering
DOI https://doi.org/10.1051/matecconf/20178701012
Published online 12 December 2016
  1. M. Safa, A. Shahi, C.T. Haas, K.W. Hipel, Automation in Construction 48, 64–73 (2004) [CrossRef] [Google Scholar]
  2. L.C. Bell, G. Stukhart, Journal of Construction Engineering and Management 112, 14–21 (1986) [Google Scholar]
  3. C.H. Caldas, C.L. Menches, P.M. Reyes, L. Navarro, D.M. Vargas, Practice Periodical on Structural Design and Construction 20, 1–8 (2014) [Google Scholar]
  4. K.K Chitkara, Construction Project Management: Planning, Scheduling and Controlling. (1998) [Google Scholar]
  5. W.C. Benton, L. McHenry, Construction Purchasing & Supply Chain Management. (2010) [Google Scholar]
  6. A.A. Gulghane, P.V. Khandve, International Journal of Engineering Research and Application 5, 59–64 (2015) [Google Scholar]
  7. Z. Ren, C.J. Anumba, J. Tah, Advanced Engineering Informatics 25, 198–207 (2011) [Google Scholar]
  8. J.M. Sardroud, Scientia Iranica 19, 381–392 (2012) [Google Scholar]
  9. J.H. Berka, W.D. Conn, AACE International Transactions 1994, SI2-1(1994) [Google Scholar]
  10. W. Barry, F. Leite, W.J. O’Brien, In Construction Research Congress 2014, 2296–2305 (2014) [Google Scholar]
  11. S. Nagapan, I. Abdul Rahman, A. Asmi, International Journal of Advances in Applied Sciences 1, 1–10 (2012) [CrossRef] [Google Scholar]
  12. H. Doloi, A. Sawhney, K.C Iyer, S. Rentala, International Journal of Project Management, 30, 479–489 (2012) [Google Scholar]
  13. X. Meng, International Journal of Project Management 30, 188–198 (2012) [CrossRef] [Google Scholar]
  14. I. Abdul Rahman, A.H. Memon, A. Azis, A. Asmi, N.H Abdullah, Research Journal of Applied Sciences, Engineering and Technology 5, 1963–1972 (2013) [Google Scholar]
  15. K.M. El-Gohary, R.F. Aziz, Journal of Management in Engineering 30, 1–9 (2014) [CrossRef] [Google Scholar]
  16. Z. Shehu, G.D. Holt, I.R. Endut, A. Akintoye, Built Environment Project and Asset Management 5, 52–68 (2015) [CrossRef] [Google Scholar]
  17. R.A. Rivas, J.D. Borcherding, V. González, L.F. Alarcón, Journal of Construction Engineering and Management 137, 312–320 (2010) [CrossRef] [Google Scholar]
  18. D.U. Kini, Journal of Management in Engineering 15, 30–34 (1999) [CrossRef] [Google Scholar]
  19. S. Donyavi, R. Flanagan, R. Proceedings of the 25th Annual ARCOM Conference, 11–20 (2009) [Google Scholar]
  20. H. Abdul Rahman, M.N. Alidrisyi, Construction Management and Economics 12, 413–422 (1994) [Google Scholar]
  21. N. Kasim, P.A.S. Ern, Int. Journal of Computer and Communication Technology 2, 1–10 (2010) [Google Scholar]
  22. N. Kasim, KICEM Journal of Construction Engineering and Project Management, 31–36 (2011) [CrossRef] [Google Scholar]
  23. S. Meeampol, S.O. Ogunlan, Journal of Financial Management of property and Construction 11, 3–20 (2006) [CrossRef] [Google Scholar]
  24. W.E. Back, L.C. Bell, Cost Engineering-Morgantown 38, 13–17 (1996) [Google Scholar]
  25. N. Kasim, C.J. Anumba, A.R.J. Dainty, Proceedings Twenty First Annual Association of Researchers in Construction Management (ARCOM) Conference, 793–802 (2005) [Google Scholar]
  26. H. Said, K. El-Rayes, Construction Research Congress 2012, 1580–1589 (2012) [CrossRef] [Google Scholar]
  27. C.H. Caldas, D.G. Torrent, C.T. Haas, Journal of Construction Engineering and Management 132, 741–749 (2006) [CrossRef] [Google Scholar]
  28. G. Ali, Advances in Management 7, 17 (2014) [Google Scholar]
  29. T.P. Madhavi, S.V. Mathew, R. Sasidharan, International Journal of Research in Engineering and Technology, 400–403 (2013) [Google Scholar]
  30. B. Cooke, P. Williams, Construction Planning, Programming and Control, (2009) [Google Scholar]
  31. W.R. Mincks, H. Johnston, Construction Jobsite Management, (2011) [Google Scholar]
  32. P. Alanjari, S. Razavialavi, S. AbouRizk, Automation in Construction 40, 1–8 (2014) [Google Scholar]
  33. S.K. Wan, M.M. Kumaraswamy, Engineering, Construction and Architectural Management 16, 208–223 (2009) [CrossRef] [Google Scholar]
  34. H.R. Thomas, D.R. Riley, J.I Messner, Journal of Construction Engineering and Management 131, 808–815 (2005) [CrossRef] [Google Scholar]
  35. A. Kazaz, E. Manisali, S. Ulubeyli, Journal of Civil Engineering and Management 14, 95–106 (2008) [CrossRef] [Google Scholar]
  36. A. Enshassi, S. Mohamed, Z. Abu Mustafa, P.E Mayer, Journal of Civil Engineering and Management 13, 245–254 (2007) [Google Scholar]
  37. R. Navon, O. Berkovich, Construction Management and Economics 24, 635–646 (2006) [CrossRef] [Google Scholar]
  38. A.P.C. Chan, D. Scott, E.W.M. Lam, Journal of Management in Engineering 18, 120–128 (2002) [Google Scholar]
  39. A.S. Ali, I. Rahmat, Journal of Retail & Leisure Property 9, 25–35 (2010) [CrossRef] [Google Scholar]
  40. H.S. Cha, C.K. Kim, KSCE Journal of Civil Engineering 15, 1319–1328 (2011) [CrossRef] [Google Scholar]
  41. M.R. Abdul Kadir, W.P. Lee, M.S. Jaafar, S.M. Sapuan, A. Ali, Structural Survey 23, 42–54 (2005) [Google Scholar]
  42. C.C. Nwachukwu, F.I. Emoh, Interdisciplinary Journal of Contemporary Research in Business 2, 90–105 (2010) [Google Scholar]
  43. D. Towey, Cost Management of Construction Projects (2013) [Google Scholar]
  44. N.J. Smith, T. Merna, P. Jobling, Managing Risk in Construction Projects (2014) [Google Scholar]
  45. A.R. Patil, S.V. Pataskar, International Journal of Engineering and Innovation Technology 3, 96–100 (2013) [Google Scholar]
  46. R.F. Aziz, Alexandria Engineering Journal 52, 51–66 (2013) [CrossRef] [Google Scholar]
  47. W.J. Del Pico, Project Control-Integrating Cost and Schedule in Construction (2013) [CrossRef] [Google Scholar]
  48. A.A. Kwakye, Construction Project Administration In Practice (1997) [Google Scholar]
  49. K.N. Jha, K.C. Iyer, Total Quality Management & Business Excellence 17, 1155–1170 (2006) [Google Scholar]
  50. R. Hughes, D. Thorpe, Construction Innovation: Information, Process, Management 14, 210–228 (2014) [Google Scholar]
  51. R.F. Cox, R.R. Issa, D. Ahrens, Journal of construction engineering and management 129, 142–151 (2003) [CrossRef] [Google Scholar]
  52. P.F. Kaming, P.O. Olomolaiye, G.D. Holt, F.C. Harris, International Journal of Project Management 15, 21–30 (1997) [Google Scholar]
  53. A. Makulsawatudom, M. Emsley, 17th Annual ARCOM Conference, 281–290 (2001) [Google Scholar]
  54. H.R. Thomas, D.R. Riley, V.E. Sanvido, Journal of Construction Engineering and Management 125, 39–46 (1999) [CrossRef] [Google Scholar]
  55. A.M. Jarkas, C.G. Bitar, Journal of Construction Engineering and Management 138, 811–820 (2011) [Google Scholar]
  56. L.L. Ekanayake, G. Ofori, Building and Environment 39, 851–861 (2004) [Google Scholar]
  57. S.H. Hassan, N. Ahzahar, M.A. Fauzi, J. Eman, Procedia - Social and Behavioral Sciences 42, 175–181 (2012) [Google Scholar]
  58. R.A. Begum, C. Siwar, J.J. Pereira, A.H. Jaafar, Resources, Conservation and Recycling 51, 190–202 (2007) [CrossRef] [Google Scholar]
  59. R.A. Begum, C. Siwar, J.J. Pereira, A.H. Jaafar Resources, Conservation and Recycling 48, 86–98 (2006) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.