Open Access
Issue |
MATEC Web Conf.
Volume 86, 2016
5th International Scientific Conference “Integration, Partnership and Innovation in Construction Science and Education”
|
|
---|---|---|
Article Number | 04003 | |
Number of page(s) | 9 | |
Section | 4 Building materials and Technologies | |
DOI | https://doi.org/10.1051/matecconf/20168604003 | |
Published online | 28 November 2016 |
- K.P. Kriukov, B.P. Novgorodtsev, Constructions and mechanical analysis of power transmission line (1979) [Google Scholar]
- D. Vinogradov, Construction of overhead power transmission lines 35-500 kV with severe track (1983) [Google Scholar]
- Ye. Gorokhov, S. Shapovalov, Ye. Udod, et al. Growth of reliability and life of the power supply network construction (1997) [Google Scholar]
- K. Kryukov, The crossings of transmission lines through of large water areas (1982) [Google Scholar]
- E.V. Shevchenko, Refinement of steel constructions of power transmission line support (1999) [Google Scholar]
- IEC 60826. Design criteria of overhead transmission lines (2003) [Google Scholar]
- EN 50341-1: Overhead electrical lines exceeding AC 45 kV. Part 1: General requirements – Common specifications (2009) [Google Scholar]
- Ya. Nazim, A. Tanasoglo, Met. Const., 49-61 (2015) [Google Scholar]
- Probabilistic design of overhead transmission lines: Companion document to “Improved design criteria of overhead transmission lines based on reliability concepts” (2000) [Google Scholar]
- B.C. Wadell, Transmission Line Design (Artech house, Norwood, 2005) [Google Scholar]
- H. Li, H. Bai, Prog. in Nat. Sc., 899–911 (2006). [Google Scholar]
- Ye. Gorokhov, M. Kazakevich, et al., Aerodynamics of the power supply structures (2000) [Google Scholar]
- G. Diana, S. Bruni, F. Cheli, F. Fossati, A. Manenti, EACWE, 1759–1766 (1997) [Google Scholar]
- M. Gaudry, F. Chore, C. Hardy, E. Ghannoum, Increasing the ampacity of overhead lines using homogeneous compact conductors (2011) [Google Scholar]
- Y. Chen, M. Farzaneh, E. Lozowski, K. Szilder, IWAIS, 1-8 (2000) [Google Scholar]
- A.G. Sokolov, Support of power transmission lines (calculation and construction) (1961) [Google Scholar]
- Ye. Shevchenko, V. Glukhov, A. Tanasoglo, Metal Structures, 31-39 (2010) [Google Scholar]
- Ya. Nazim, Ye. Shevchenko, Mod. Ind. and civ. Const., 83–95 (2014). [Google Scholar]
- Ye. Shevchenko, Ya. Nazim, A. Tanasoglo, I. Garanzha, Proc. Eng., 1033–1040 (2015). [Google Scholar]
- P. Couneson, J. Lamsoul, D. Delplanque, Proc. CIGRE, 18-76 (2013) [Google Scholar]
- G. Arzhakov, Metal structures. Special buildings and structures (2002) [Google Scholar]
- A. Perelmuter, Computational models of structures and the possibility of their analysis (2002) [Google Scholar]
- A. Tanasoglo, I. Garanzha, V. Glukhov, Met. Struct., 39-48 (2015) [Google Scholar]
- J. Lamsoul, J. Rogier, P. Couneson, A. Van Overmeere, Belgian experience on initiatives to improve the capability of existing overhead lines (2000) [Google Scholar]
- DBN В.2.6 – 163:2010 Steel structures. Standards of design, manufacturing and installation (2011) [Google Scholar]
- Manual for design of steel structures of overhead transmission line supports (OHTL) and power outdoor switchgear (OSG) substations with voltage up to 1kV (to SNiP II-23-81*) (1989) [Google Scholar]
- Design of Latticed Steel Transmission Structures, American Society of Civil Engineers. ANSI/ASCE 10-90, A.N.S.I. (1991) [Google Scholar]
- A. Tanasoglo, Mod. Ind. and civ. Const., 5–14 (2015) [Google Scholar]
- M. Gaudry, F. Chore, C. Hardy, Proc. CIGRE, 180-201 (2008) [Google Scholar]
- Rules for electrical installation. Head 2.5 «The overhead power transmission lines voltages above 1 kV to 750 kV» (2006) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.