Open Access
Issue
MATEC Web Conf.
Volume 73, 2016
XV International Conference “Topical Problems of Architecture, Civil Engineering, Energy Efficiency and Ecology – 2016”
Article Number 01005
Number of page(s) 7
Section Buildings and Structures, Foundations and Underground Constructions, Bridges, Highways and Tunnels
DOI https://doi.org/10.1051/matecconf/20167301005
Published online 11 August 2016
  1. Bukhartsev V.N., Petrichenko M.R., Power Techology and Engineering, 46(3), 185–189 (2012) [CrossRef] [Google Scholar]
  2. Bukhartsev V.N., Petrichenko M.R., Power Techology and Engineering, 46(3), 1–3 (2012) [CrossRef] [Google Scholar]
  3. Kolosova G.S., Lalin V.V., Kolosova A.V., Magazine of civil engineering, 5, 76–85 (2013) [CrossRef] [Google Scholar]
  4. Benin A.V., Semenov A.S., Semenov S.G., Advanced Materials Research, 831, 364–369 (2014) [CrossRef] [Google Scholar]
  5. Kitaeva D.A., Rudaev Y.I., Ordobaev B.S., Abdykeeva S.S. Applied Mechanics and Materials, 725–726, 623–628 (2014) [Google Scholar]
  6. Lalin V.V., Savchenko A.V., Zdanchuk E.V., Yavarov A.V., Belyaev D.I., Construction of unique building and structures, 7, 30–37. (2013) [Google Scholar]
  7. Code Design 40.13330.2012 Concrete and reinforced concrete dams. (Moscow, Minregion Russia, 2012) [Google Scholar]
  8. Dyatlovitskiy L.I. Napryazheniya v gravitatsionnikh plotinakh na neskalnikh osnovaniyakh [Stresses in gravity dams on the not rocky grounds] (AN YSSR, 1959) [Google Scholar]
  9. Konstantinov I.A., Kuzmin S.A. Issledovanie napryazhennogo sostoyaniya betonnoy vodoslivnoy plotiny na neskalnikh gruntakh metodom konechnykh elementov [Investigation of the stress state of the concrete spillway dam on the not rocky grounds with finite element method]. (col.book Altay Polytechnic University, 1985) [Google Scholar]
  10. Ymanskiy A.A. Spravochnik proektirovshika [Designer’s reference book]. (vol.2 Moscow, 1973) [Google Scholar]
  11. Efimov YU.N., Kolosova G.S., Konstantinov I.A., Sapozhnikov L.B. Ychet podatlivosti osnovaniya pri staticheskom raschete plotin metodom konecnykh elementov [Accounting for compliance of foundation in static analysis of dams with finite element method]. (B.E. Vedeneev VNIIG, 1973) [Google Scholar]
  12. Grishin M.M. Gidrotehnicheskie sooruzheniya [Hydrotechnical constructions] (Vyssh.shk, 1979) [Google Scholar]
  13. Teleshev V.I. Konstruktivno-tekhnologicheskie meropriyatiya po obespecheniyu treshinostoykosti i monolitnosti massivnyh betonnikh gidrotehnicheskikh sooruzheniy [Design and technological measures to ensure the fracture toughness and solidity of massive concrete hydraulic structures] (LPI, 1983) [Google Scholar]
  14. Katzenbach R., Werner A., Kempfert H.-G., Savidis S., Steffens K., Wesemüller H. Darmstadt Geotechnics, 11, 109–12. (2003) [Google Scholar]
  15. Svatovskaya L., Sychova A., Sychov M., Okrepilov V., MATEC Web of Conferences, 53, Article Number 01023 (2016) [Google Scholar]
  16. Argal É., Korolev V., Kudrin K., Ashikhmen V. Power Technology and Engineering (formerly Hydrotechnical Construction), 43(6), 337–344 (2009) [CrossRef] [Google Scholar]
  17. Mirzabozorg H., Ghaemian M., Noorzad A., Abbasi Zoghi M. International Journal of Earthquake Engineering and Engineering Seismology (EEE), 3, 52–60 (2007) [Google Scholar]
  18. Mirzabozorg H., Khaloo A.R., Ghaemian M., Jalalzadeh B. International Journal of Earthquake Engineering and Engineering Seismology (EEE), 2, 48–57 (2007) [Google Scholar]
  19. Brandão J.L.B. Water Resources Management, 24(12), 3101–3114 (2010) [Google Scholar]
  20. Kurzin V. B., Seleznev V. S., Journal of Applied Mechanics and Technical Physics, 51(4), 590–597 (2010) [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.