Open Access
Issue
MATEC Web of Conferences
Volume 34, 2015
2015 2nd International Conference on Mechatronics and Mechanical Engineering (ICMME 2015)
Article Number 02015
Number of page(s) 4
Section Mechanical design and manufacturing
DOI https://doi.org/10.1051/matecconf/20153402015
Published online 11 December 2015
  1. Q. Guilin, The submarine construction technology, Beijing: National Defence Industry Press, 1982. [Google Scholar]
  2. C. Lei. Naval construction process, Beijing: Haicao Press, 2003. [Google Scholar]
  3. Z. Xiaojun and W. Peng, “Experimental study on submarine pressure-hull structure radial initial deflection calculate method”, Ship Science and Technology, vol. 35(1), pp. 42–45, 2013. [Google Scholar]
  4. W. Peng and Z. Xiaojun, “Investigation of Submarine Pressure hull Radial Flesibility Assess Method”, Journal of Wuhan University of Technology (Transportation Science &Engineering), vol. 37(1), pp. 149–152, 2013. [Google Scholar]
  5. Z. Wenxian and T. benzao, “Non-linear adjustmentmodel of three-dimensional coordinate transformation”, Geomatics and Information Science of Wuhan University, vol. 28(5), pp. 136–139, 2003, [Google Scholar]
  6. W. Xinzhou, Theory and application of parameter estimation in nonlinear model, Wuhan: Wuhan University Press, 2002. [Google Scholar]
  7. G. Yunlan and C. Xiaojun, “A Robust Method for Fitting a Plane to Point Clouds”, Journal Of Tongji University(NatuRal Science), vol.36(7), pp. 981–985, 2008. [Google Scholar]
  8. S. Gass and C. Witzgall. “On an approximate minimax circle closet to a set of point”, Computers & Operations Reasearch, vol. 31.pp. 637–643, 2004. [CrossRef] [Google Scholar]
  9. Z. Yueyin and P. Guorong, “Accuracy Of Coordinate Transfer Influenced By Different Distributions Of Common Points”, Journal Of Geodesy And Geodynamics, vol. 33(2), pp. 105–109, 2013. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.