Preliminary Design of Electric Part of Thermoelectric Unit in a Power Plant
1 Grade 20 Guangdong University of Science and Technology, Dongguan, Chain
2 Guangdong University of Science and Technology, Dongguan, Chain
* Corresponding author: 742784397@qq.com
With the rapid development of society, people’s awareness of environmental protection continues to strengthen, countries also pay more and more attention to environmental protection, whether from the national policy or from the green development of enterprises in the future, the improvement of power plant operation efficiency is imperative. Among them, improving the operation efficiency of thermal power plants is the top priority, and it is also an important link of national economic transformation. The design of electrical part is an important part of improving the operation efficiency of thermal power plants. 2x300MW thermal power plant is designed, including the power plant electrical main wiring design, plant power design, the main circuit of the power plant short-circuit calculation, and it choose the electrical stability and thermal stability of the better electrical equipment. The short circuit calculation of the main circuit of the power plant is carried out and preliminary planning of the secondary circuit scheme is made. A power plant with higher operating efficiency is designed. While improving the operation and economic efficiency of the power plant, it also ensures the reliability, stability and economy of the power plant.
Key words: Electrical part / Thermal power plant / Short-circuit calculation / Electrical equipment selection
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.