History, diagnosis and repair of the Corniche Kennedy in Marseilles
1
Setec DIADES, Production Department, 75 012 Quai de la Rapée 42, France
2
Setec TPI, Editorial Department, 75 012 Quai de la Rapée 42, France
* Corresponding author: loriana.pace@setec.com
The Corniche Kennedy is an emblematic road of the city of Marseilles in France. Located on the seafront, it was built in the 19th century and widened in the 1960s to create a corbelled pedestrian promenade. Its widening structure, made of slabs resting on corbels anchored in a retaining wall or on crossing structures, has been subjected for more than 60 years to a very aggressive marine environment and presents many damages. After having carried out the diagnosis of the structure, the Infrastructure Department of the Metropole of Aix-Marseille-Provence selected the engineers of the Setec Group to carry out the complete project management for the rehabilitation of the Corniche Kennedy. Between 2018 and 2022, the Corniche Kennedy underwent major rehabilitation work, using modern techniques to prevent and treat the main pathology of the structure, the corrosion. This article presents all the steps of the rehabilitation of the Corniche Kennedy from diagnosis to maintenance of the structure after renovation.
© The Authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.