Renovation of Nijkerker bridge - Innovative procurement and intensive collaboration lead to optimal approach
1 Vogel Cathodic Protection, Zwijndrecht, The Netherlands
2 ABT Consulting Engineers, Velp, The Netherlands
3 Rijkswaterstaat (Dutch Highway Agency), Utrecht, The Netherlands
* Corresponding author: rtmaten@mourik.com
The Nijkerker bridge (est. 1965) proved to have insufficient structural capacity to carry the current traffic loads. A contemporary way of collaboration between Rijkswaterstaat (the Dutch Highway Agency) and private parties was introduced for this project. After the design phase, renovation of the bridge was chosen instead of demolition and construction of a new bridge. Due to the collaboration between the parties involved, an optimal solution was found to increase the lifespan of the bridge by the demanded 30 years and minimize the traffic hindrance during the renovation of the bridge.
© The Authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.