Issue |
MATEC Web Conf.
Volume 296, 2019
2019 7th International Conference on Traffic and Logistic Engineering (ICTLE 2019)
|
|
---|---|---|
Article Number | 02007 | |
Number of page(s) | 4 | |
Section | Logistics Engineering | |
DOI | https://doi.org/10.1051/matecconf/201929602007 | |
Published online | 22 October 2019 |
Total cost of ownership in pallet pools management
Department of Logistics, Faculty of management and Economics of Services, University of Szczecin, Cukrowa 8 Street, 71-004 Szczecin, Poland
a Corresponding author: mariuszsowa.ps@poczta.fm
Every loading pallet, regardless of the type, in order to be considered safe during the operation phase, must meet certain formal requirements already at the implementation stage. The loading pallet marketed has a certain life span. The life of the pallet depends on many factors. First of all, they are related to the physical and economic aging of the product . Physical aging consists in the fact that the materials from which the products have been made lose their properties, and the economic ones are the result of the emergence of new, better products on the market, better meeting the specific needs of recipients. The operational life of the cargo pallet also depends on the organization of the transport process, branch and means of transport as well as the date of its completion. The concept of calculating the total cost of ownership of a reusable loading pallet in logistic processes, proposed in the article, allows to determine the total costs of its operation. It is based on the idea of Total Cost of Ownership (TCO), which includes total acquisition costs, installation costs, maintenance costs and costs of its disposal over particular time
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.