Issue |
MATEC Web Conf.
Volume 270, 2019
The 2nd Conference for Civil Engineering Research Networks (ConCERN-2 2018)
|
|
---|---|---|
Article Number | 05005 | |
Number of page(s) | 6 | |
Section | Construction Engineering and Management | |
DOI | https://doi.org/10.1051/matecconf/201927005005 | |
Published online | 22 February 2019 |
Construction cost optimization of shallow foundation for sand soil in Indonesia
Department of Civil Engineering, Faculty of Engineering, Universitas Indonesia, Depok, Indonesia
* Corresponding author: azhim23@gmail.com
In designing foundation, there are three fundamental requirements namely: ultimate limit state (ULS), serviceability limit state (SLS), and economics. Generally, the ULS and SLS are the focus of the design process, while the cost factors are not explicitly considered. This paper deals with the three requirements with the minimum construction cost as the controlling objective. A wide range of sand density conditions are considered, while the typical ULS and SLS design checks available in the literature are employed. The optimization tool used is the Solver add-in function available in MS-Excel™. The effects of different construction cost structures in four Indonesia's provinces are examined in this paper. The purpose of this research is to be able in designing the shallow foundation with 3 aspects consideration at once, namely ULS, SLS and economic. On the other hand, this research is to analyse the sensitivity's factor which influence the design, namely work unit price, soil properties and design's requirements.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.