Issue |
MATEC Web Conf.
Volume 270, 2019
The 2nd Conference for Civil Engineering Research Networks (ConCERN-2 2018)
|
|
---|---|---|
Article Number | 03007 | |
Number of page(s) | 5 | |
Section | Transportation Engineering and Planning | |
DOI | https://doi.org/10.1051/matecconf/201927003007 | |
Published online | 22 February 2019 |
Road improvement from flexible pavement to rigid on Munjul - Panimbang Road Banten
Civil Engineering Department, Banten Jaya University, Serang City Banten, Indonesia
* Corresponding author: tellyrosdiyani004@gmail.com
Roads are an important element in promoting public welfare. With the approach of regional development, the achievement of balance and equitable regional development. Munjul-Panimbang Road Section, a crossroads of tourist access and liaison between villages and sub-districts, this certainly requires an increase in roads in facilitating transportation mobility. Improving the pavement structure that has been declining is one of the solutions that must be done immediately by replacing the pavement flexure structure into concrete pavement (Rigit Pavement). This project has been completed, thereby analyzing the suitability of the Concrete Pavement Road Pavement Planning. This road improvement uses the Concrete Pavement Concatenated Pavement (BBDT) type, stretching the thickness of concrete plate and the required reinforcement diameter. The research method based on Concrete Pavement Concrete Pavement Planning, Pd T-14 2003. Primary data and secondary data are needed as supporting in research. The result of the analysis shows that concrete pavement planning is 15 cm thick concrete plaster and perforated reinforcement per meter using 5D15 mm - 200 mm, while crosslinks per meter of 2D10 mm - 500 mm can withstand the burden of vehicles traveling on the road with the age of 20 years.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.