Issue |
MATEC Web Conf.
Volume 265, 2019
International Geotechnical Symposium “Geotechnical Construction of Civil Engineering & Transport Structures of the Asian-Pacific Region” (GCCETS 2018)
|
|
---|---|---|
Article Number | 07020 | |
Number of page(s) | 5 | |
Section | Construction Management and Economics | |
DOI | https://doi.org/10.1051/matecconf/201926507020 | |
Published online | 30 January 2019 |
Specific control mechanisms for the Russian railway construction in the reign of Alexander III
St. Petersburg Academy of In-Service Pedagogical Education, St. Petersburg, Russia
* Corresponding author: ibarykina@mail.ru
The article covers the issues of the Russian railway development as part of the supply chain. The author discusses management process specific features in respect of the Northern Railway network construction and historical aspects concerning the Russian Empire during the reign of Alexander III. Solution to this problem was to develop specific (extraordinary) mechanisms of public governance. They included a special Institute of the Commission of experts and a special form of legislative acts called the all-Merciful manifestos. The study revealed disadvantages of such autocratic governing practice for railway construction and proved inefficiency of this approach to develop controlling mechanisms.
© The Authors, published by EDP Sciences, 2019
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.