Issue |
MATEC Web Conf.
Volume 265, 2019
International Geotechnical Symposium “Geotechnical Construction of Civil Engineering & Transport Structures of the Asian-Pacific Region” (GCCETS 2018)
|
|
---|---|---|
Article Number | 07013 | |
Number of page(s) | 9 | |
Section | Construction Management and Economics | |
DOI | https://doi.org/10.1051/matecconf/201926507013 | |
Published online | 30 January 2019 |
Estimating cost of using a rotation system when operating in rigorous climate regions
1
Tyumen Industrial University, Volodarskogo St., 38, Tyumen, 625000, Russia
2
Samara State Technical University, Molodogvardeyskaya St., 194, Samara, 443100, Russia
* Corresponding author: minnullinaay@yandex.ru
Basic cost estimation techniques concerning the use of a rotation system in operation consider particular characteristics of rigorous climate regions. By means of the offered recommendations the following indicators are defined: an average number of workers for operation; an amount of salary supplements; standard working hours for personnel on rotating assignments; equipment relocation costs, rotation camp maintenance and rotation worker transportation costs. In the situation when a building contractor has to prove camp accomplishment costs in details most road builders face the difficulties in cost sheet formation. The offered technique of cost estimation is approved at the road section being influenced by Arctic Extremes and confirmed its operational flexibility.
© The Authors, published by EDP Sciences, 2019
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.