The Possibility of Capacity Increase on the Modernised and Electrified Railway Line R201 along the Zaprešić – Zabok Section
University of Zagreb Faculty of Traffic and Transport Science, 10000 Zagreb, Croatia
* Corresponding author: ivica.ljubaj@fpz.hr
This paper is focused on the regional railway track line R201 which begins at the Zaprešić railway station (who is a part of the M101 railway line - part of this Mediterranean corridor) and it separates itself from the international Mediterranean TEN-T corridor. In the forthcoming period is planned electrification and modernization of the R201 railway line, so this paper will be focused on capacity calculation as well on the utilization of the new available capacity. There will be made simulation, with the Opentrack program package for railway simulation, of the possibility to equip this line with the ETCS Level 1 and Level 2 safety systems and then it will be made comparation of the results (available capacity) obtained by simulations with the results without having equipped track with these modern safety systems. As the main idea of electrification and modernization of this track is to include her in the suburban passenger system of the city of Zagreb and to transport freight by railway, there will be given some suggestions how to improve capacity utilization.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.