Issue |
MATEC Web Conf.
Volume 229, 2018
International Conference on Disaster Management (ICDM 2018)
|
|
---|---|---|
Article Number | 03016 | |
Number of page(s) | 8 | |
Section | Enhancing Framework for Sustainbility | |
DOI | https://doi.org/10.1051/matecconf/201822903016 | |
Published online | 14 November 2018 |
The evaluation of road maintenance programs, case study: the national road maintenance programs in West Sumatra
1 Post graduate Student, Andalas University, LimauManis, Padang, 25163, Indonesia
2 Senior Lecturer, Andalas University, LimauManis, Padang, 25163, Indonesia
* Corresponding author: bayumartantoadji@ymail.com
Currently, due to the limitation of funding, the national road maintenance programs in West Sumatra which were based on the output from IIRMS (Indonesian Integrated Road Management System) cannot be fully implemented. In order the road maintenance can be carried out effectively according to parameters considered, the ranking of roads priority must be determined. In this study, analyzes were conducted in the determination of national road maintenance priorities. The parameters used are SDI, IRI, road width, and V / C ratio. The methods used were the AHP (Analytical Hierarchy Process), IPA (Importance Performance Index) modification, and CSI (Customer Satisfaction Index) modification. In the study also evaluated the effectiveness of road maintenance program which was made by Satker P2JN, BPJN III compared to the result of the analysis. The result shows that there was still ineffectiveness of road maintenance programs made by BPJN III.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.