Issue |
MATEC Web Conf.
Volume 216, 2018
X International Scientific and Technical Conference “Polytransport Systems”
|
|
---|---|---|
Article Number | 03004 | |
Number of page(s) | 7 | |
Section | Construction and Transport Machinery, Non-Destructive Testing and Technical Diagnostics | |
DOI | https://doi.org/10.1051/matecconf/201821603004 | |
Published online | 17 October 2018 |
Quality assurance and control system for railway track tamping
Siberian Transport University, 630049 Novosibirsk, Russia
* Corresponding author: asi80@ngs.ru
Ensuring stable parameters of a railway track after bringing it into a design position is a key measure of quality for evaluating completed repairs. Identifying quality criteria for sleeper tamping using a special rolling stock is a high-priority problem for a railway track infrastructure. This problem is complicated by a large choice of ballast compaction, leveling and finishing machines, totaling more than 30 types. The paper presents results of theoretical studies aimed at assuring and controlling the quality of tamping by multi-purpose track machines. The factors that determine the stability of railway track parameters in operation were identified. The track repair processes were analyzed. The operating factors that are essential for developing qualitative process parameters were identified for various types of track machines. Based on the findings of these studies, a quality assurance and control methodology was developed for railway track repair and maintenance operations.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.