Issue |
MATEC Web Conf.
Volume 212, 2018
2018 International Scientific Conference “Investment, Construction, Real Estate: New Technologies and Special-Purpose Development Priorities” (ICRE 2018)
|
|
---|---|---|
Article Number | 08028 | |
Number of page(s) | 11 | |
Section | Economics and Investment Attractiveness | |
DOI | https://doi.org/10.1051/matecconf/201821208028 | |
Published online | 15 October 2018 |
Developing a risk management system and assessing the effectiveness of integrated risk management in the space rocket sector
Gazprombank, 16, Building 1, Nametkina str., 117420, Moscow, Russia
* Corresponding author: Oleg.Fadeev@gazprombank.ru
The article discusses the formation of the system of risk management and evaluation of the effectiveness of integrated project risk management in the space rocket sector. The classification of the integrated project risks for knowledge-based enterprise in the space rocket sector and credit institution was made. The main methods of project risks evaluation, which can be applied in the space rocket sector, are described. The scheme of integrated project risk management was made on the basis of the life cycle approach when implementing projects in the space rocket sector. When implementing project risks in the space rocket sector, an enlarged scheme of the Regulations on Integrated Project Risk Management System, was developed. An issue of integrated risk management in the space rocket sector using a system of measures being named the “Value-at-Risk” (VaR) was reviewed. It was concluded that there was a need for project implementation in the space rocket sector using a complex, effective, and integrated system of risk management.
© The Authors, published by EDP Sciences, 2018
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.