Subsea Equipment Decommissioning Using Fiber Rope
1
Graduate Institute of Ferrous Technology, POSTECH,
Pohang,
South Korea
2
Department of Civil and Environmental Engineering, University Teknologi PETRONAS,
Seri Iskandar 32610,
Perak,
Malaysia
* Corresponding author: smankim@postech.ac.kr
A comparative study of lifting lines for subsea equipment decommissioning was conducted to evaluate the applicability of fiber ropes. Generally, conventional steel wire ropes are used for subsea equipment decommissioning operations, but there are some disadvantages in using steel wires as the lifting lines at deepwater depth. To overcome the disadvantages, fiber ropes are proposed for using as lifting lines. The comparative methods to evaluate the performance of both lifting lines include three sections of calculations, payload capacity, and horizontal offset due to current, critical length of lifting line. Moreover, dynamic analysis using Orcaflex was performed to compare the dynamic forces occurring in the lifting lines during subsea equipment decommissioning. The results showed that the fiber ropes had advantages in payload capacity, critical length of lifting line and lower dynamic forces occurred compared to the steel wire ropes at deepwater depth.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.