Issue |
MATEC Web Conf.
Volume 198, 2018
2018 Asia Conference on Mechanical Engineering and Aerospace Engineering (MEAE 2018)
|
|
---|---|---|
Article Number | 01004 | |
Number of page(s) | 5 | |
Section | Power Machinery and System Analysis | |
DOI | https://doi.org/10.1051/matecconf/201819801004 | |
Published online | 12 September 2018 |
Finite element analysis of Bridge Crane Metal Structure Based on ABAQUS
1
Nanjing University of Science and Technology, Nanjing, China
2
Jiangsu Province Special Equipment Safety Supervision Inspection Institute, Nanjing, China
Taking the QD-type (50/10t-31.5) bridge crane as the research object and the finite element method as theoretical basis, the metal structure using ABAQUS software is analyzed. Firstly, the three-dimensional model of the metal structure is established according to the design parameters. Second, the bridge crane under three typical operation conditions is analyzed and the stress and displacement analysis results are presented. And, the strength and stiffness of the crane are verified based on the analysis results. Moreover, the maximum stress and displacement under dangerous conditions of the crane are calculated by theoretical calculation. By comparing the results of the theoretical method and the finite element method. The research can favor to increase the design efficiency.
© The Authors, published by EDP Sciences, 2018
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.