User cost estimation on flexible and rigid pavement
1
Doctoral Program in Civil Engineering, Faculty of Engineering, Sebelas Maret University, Surakarta, Indonesia
2
Civil Engineering Departement, Sebelas Maret University, Surakarta, Indonesia
2
Civil Engineering Departement, Diponegoro University, Semarang, Indonesia
* Corresponding author: fajr_hani@yahoo.co.id
The unsatisfactory condition of Indonesia’s local roads needs to be improved to support the national transportation network. However, construction activities to improve it often have negative impacts, among other: an increase of user cost. This article aims to calculate user cost generated by flexible and rigid pavement construction. This study was carried out on a local road in Indonesia. Life cycle cost analysis (LCCA) method is used to analyse the user cost. The results show that user cost of flexible pavement construction of 10 years and 20 years’ design life are US$ 734,290 and US$ 449,830 respectively, futhermore user cost of rigid pavement construction of 10 years and 20 years’ design life are US$ 1,994,920 and US$ 1.203.640 respectively. These indicate that the longer the analysis period, the more economical the user cost.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.