Issue |
MATEC Web Conf.
Volume 193, 2018
International Scientific Conference Environmental Science for Construction Industry – ESCI 2018
|
|
---|---|---|
Article Number | 02021 | |
Number of page(s) | 8 | |
Section | Environmental Engineering | |
DOI | https://doi.org/10.1051/matecconf/201819302021 | |
Published online | 20 August 2018 |
Typological features of water structures of the Railway in West Siberian Urban territories
Novosibirsk State University of Architecture and Civil Engineering, 630099 Novosibirsk, Russia
*
Corresponding author : michmacha@mail.ru
The railway construction was a new phenomenon for Russia and was not sufficiently studied from a technological point of view. Primarily, climatic and geographical factors were the main problems in the process of the Trans-Siberian Railway construction. Severe winter, permafrost, mountainous, abundant forest terrain created certain difficulties during the construction phase. Therefore, the builders were forced to violate the nature integrity and lay the railway lines along the most profitable routes. The railway line was naturally chosen, first it should pass through large settlements, and secondly, the important factor was the location of the station near the water source for the uninterrupted operation of locomotives. But together with technological progress, this system was evolved into a complex organism, which parts were modernized, and some of them turned into inefficient structures that are collapsing and polluting the environment.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.