Research on widening construction clearance on the transition curve of existing railway lines based on SIMPACK
Beijing Jiaotong University, School of traffic and transportation, 100044, shangyuancun 3#, China
* Corresponding author: Li Chen: 734407801@qq.com
This paper selects appropriate vehicle as the standard vehicle and designs its shape. Secondly, it chooses some control point on the vehicle according to the current standard. Thirdly, the essay sets four difficult operating conditions with different curve radius and superelevation, simulates on the SIMPACK software and compares the value of control points offset the centre of railway line to the current construction clearance. According to the result of comparison, this paper divides transition curve into three parts to widen construction clearance and proposes the definition of correction coefficient. At last, the paper compares construction clearance that has been corrected with existing construction clearance to check whether the new one is right or not. The study shows that if curve part is divided into three parts to widen construction clearance, it would be more reasonable and satisfactory.
© The Authors, published by EDP Sciences 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.