Issue |
MATEC Web Conf.
Volume 175, 2018
2018 International Forum on Construction, Aviation and Environmental Engineering-Internet of Things (IFCAE-IOT 2018)
|
|
---|---|---|
Article Number | 03010 | |
Number of page(s) | 4 | |
Section | Computer Simulation and Design | |
DOI | https://doi.org/10.1051/matecconf/201817503010 | |
Published online | 02 July 2018 |
Training of argon arc welding process for tube aluminum busbar melting pole in UHV power station
State Grid of China Technology, Ji’nan, Shandong 250000, China
* Corresponding author: Email:hy19870604@163.com
The development of power grid is showing that voltage level is from low to high, networking scale is from small to large, level of automation is from weak to strong.. [1] as the hub of power grid connection between substations, the capacity and automation level of substations is also improving. The large diameter and thick walled tubular busbars of substations have been widely applied. Because of the wide application of tubular aluminum busbar, its welding quality has affected the overall quality of the power plant. Therefore, it is an effective way to improve welding level of power station busbar by scientifically making technological measures and welding codes and carrying out adaptive training for welding operators. In view of the feasibility of the argon arc welding (MIG) welding process and the feasibility of training for the tubular aluminum busbar of UHV power station, the characteristics of the welding technology of tubular aluminum busbar and the technological measures taken by the welding technicians are discussed.
© The Authors, published by EDP Sciences 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.