Issue |
MATEC Web Conf.
Volume 170, 2018
International Science Conference SPbWOSCE-2017 “Business Technologies for Sustainable Urban Development”
|
|
---|---|---|
Article Number | 03002 | |
Number of page(s) | 6 | |
Section | Engineering Systems and Building Materials | |
DOI | https://doi.org/10.1051/matecconf/201817003002 | |
Published online | 13 June 2018 |
Prognostication of relations between the buildings age and deterioration of construction
1
Peter the Great St.Petersburg Polytechnic University, Polytechnicheskaya, 29, St. Petersburg, 195251, Russia
2
Saint Petersburg State University of Architecture and Civil Engineering, Vtoraya Krasnoarmeiskaya str. 4. St. Petersburg, 190005, Russia
* Corresponding author: p198320@yandex.ru
The untimely reconstruction of the building can lead to its liquidation, despite the intrinsic value. Such measures can be prevented if a competent program for organizing reconstruction is present. To create an organizational and technological model of reconstruction, it is necessary to know the parametric dependencies of the characteristics of the studied buildings. To analyze the data on the conditions of existing houses, a mathematical model is used, built in the 3d table curve software. 55 houses were selected, 11 buildings in 5 districts of St. Petersburg. Using of the equations obtained, it is possible to predict the deterioration of structural elements in the future using the described method. The most important thing is the organization of timely actions on the basis of projected data: planned repair and reconstruction.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.