The influence of factor space on the value of discount rate in the assessment of investment projects
1
Moscow state University of technology and management. K.G. Razumovsky, Zemlyanoy Val street, 73, Moscow, 109004, Russia
2
Gzhel State University, Moscow region, Ramensky district. p. Elektroizolyator, 67, 140155, Russia
3
Moscow State University of Civil Engineering, 129337, Yaroslavskoye shosse, 26, Moscow, Russia
4
Voronezh State Technical University, Moscow Avenue, 14, 394026, Voronezh, Russia
* Corresponding author: jfano@mail.ru
The purpose of the paper is to identify factor space influencing on the value of discount rate in the assessment of effectiveness of investment and construction projects. As a result of investigation, a general classification of investment and construction risks was drawn up, depending on influence of external and internal environment of the enterprise. The factor space, which is used for initial data of separate investment and construction projects, was identified. A general algorithm of risk assessment of investment and construction project is developed, taking into account the reasoned justification of the method used for discount rate calculation, with the possible application of the variable discount rate at different stages of project’s life cycle.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.