Risk assessment related to the choice of contractors performing the job
1
Peter the Great St. Petersburg Polytechnic University, 29 Politechnicheskaya St., St. Petersburg, 195251, Russia
2
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, 129337, Russia
* Corresponding author: valitovajulian@gmail.com
Construction and investment projects inherent risks in an extremely wide range of human activity fields. An analysis of risks from the viewpoint of management and mitigation is conducted in this article. Particular attention is paid to the analysis of risk events related to the choice of an unqualified contractors performing the job. The compliance of duration implementation project, the budget amount, and the quality of performed work depend on this choice. The contractors risk assessment methods analysis showed that besides the overall criterion for all methods connected to the cost of work it is vital to take into account the qualifications, reputation, material and technical base of a contractor, the time and quality of the work performed previously. Existing methods with criteria of the choice of contractors performing the job are considered. The universal methodology with a set of criteria that satisfies all construction process participants, and based on publicly accessible information about companies and their experience is essential.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.